Claim Missing Document
Check
Articles

Found 1 Documents
Search

ESTIMASI SUMBERDAYA NIKEL LATERIT PADA BLOK 1A PT. XYZ PULAU GEBE Supriyono; Jance Murdjani Supit
INTAN Jurnal Penelitian Tambang Vol. 3 No. 1 (2020): INTAN Jurnal Penelitian Tambang
Publisher : Jurusan Teknik Pertambangan Program Studi S1 Teknik Pertambangan Fakultas Teknik Pertambangan dan Perminyakan Universitas Papua

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (462.006 KB) | DOI: 10.56139/intan.v3i1.54

Abstract

XYZ is a company engaged in the field of lateritic nickel mining, where the Mining Business License Area (WIUP) is located in Umera Village, Gebe Island District, Central Halmahera Regency, North Maluku Province. This study aims to estimate Block 1A lateritic nickel resources, and classify the lateritic nickel resources. The analysis conducted is univariate statistical analysis, outliers, semivariogram analysis, variogram validation, ordinary kriging estimation with the results obtained by tonnage of lateritic nickel resources (Ni) and kriging variance values ​​that can be used for determining the classification of resources through Relative Kriging Standard Deviation (RKSD). Indicated mineral resources of lateritic nickel in Block 1A is 3,240,730,596 tons.