Bambang Purwanggono Sukarsono
Universitas Diponegoro

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

RISK STUDY OF SUPPLY CHAIN OF LEARNING MODULE PROCUREMENT PROJECT (CASE STUDY: PT. XYZ) Rheza Aulia Ramadhan; Ananda Vania Arisa Putri; Bambang Purwanggono Sukarsono
J@ti Undip: Jurnal Teknik Industri Vol 16, No 4 (2021): Edisi Khusus ACISE 2021
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (267.141 KB) | DOI: 10.14710/jati.16.4.235-241

Abstract

Modern era has an impact on the industry. Relate to technology to turn raw goods into finished goods. Look at competitive in competition between companies that are required to customer demand. PT. XYZ is a publishing and printing company, constructing and concocting books and learning modules. Currently PT. XYZ does not yet have structured risk management to identify and mitigate risks that occur primarily in supply chain functions. Therefore, research is needed that aims to identify possible risks in PT. XYZ supply chain activities. Determine the cause of risk that must be prioritized to be mitigated in the supply chain PT. XYZ and determine mitigation strategies that must be prioritized to address the causes of risks in the supply chain PT. XYZ. The method used in this study is by the House of Risk method. HOR is used to identify risk events, risk agents in the supply chain and design mitigation strategies for risk agents based on ARP (Aggregate Risk Potential) value. The results of this study show that there are 10 risk events and 15 risk agents that become supply chain risks as well as recommendations for tackling priority risk agents.
RISK ANALYSIS AND MANAGEMENT OF PROCUREMENT ACTIVITIES IN ELEMENTARY SCHOOL BOOK PRINTING PROJECT USING HOUSE OF RISK METHOD Ananda Vania Arisa Putri; Rheza Aulia Ramadhan; Bambang Purwanggono Sukarsono
J@ti Undip: Jurnal Teknik Industri Vol 16, No 4 (2021): Edisi Khusus ACISE 2021
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (188.064 KB) | DOI: 10.14710/jati.16.4.225-229

Abstract

Risk management is a management effort to control the company's risk operations by conducting risk analysis, risk evaluation and mitigation plan. Risk management efforts are feasible to be applied to the company's business activities including procurement activities. PT XYZ is one of the printing companies whose main demand is the printing of Elementary School Books. There is a decrease in demand that results in disruption to the company's cash flow so that a tight money policy is applied to every company's activity including procurement activities. This policy increases the risk that may occur, so risk management efforts are needed to minimize the impact that can occur. The House of Risk method is used to identify risk events and risk agents that cause them, and design mitigation measures to address those risk agents. The results showed that there were 10 risk events and 10 identified risk agents, with priority risk agents to be handled are A1 (volume and type of raw materials are incorrect) and A3 (communication interruption). There are 5 recommended mitigation measures.