Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS KELAIKAN FUNGSI JALAN NASIONAL SECARA TEKNIS DI PROVINSI DAERAH ISTIMEWA YOGYAKARTA (Studi Kasus: Beberapa Ruas Jalan Nasional di Provinsi Daerah Istimewa Yogyakarta) Haris Firdaus; Latief Budi Suparma; M. Fauzie Siswanto
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 6, No 2 (2022): Vol 6 No. 2 Tahun 2022
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v6i2.799

Abstract

A roadway is an infrastructure land required to have a Certificate of Worthiness as a requirement for the roadway to operate in the public interest and a guarantee that the roadway could provide safety, security, and legal certainty for the user and road organizer. The purpose of this study is to analyze the roadworthiness of several National Roads in the Special Region of Yogyakarta, i.e., 006 Kulon Progo City Boundary Section - Yogyakarta (11.21), 008 Yogyakarta - Piyungan Section (8,760), 016 Section City Boundary Sleman - Yogyakarta (5,644), with a total length of 25.614 km. Further analysis was conducted to find out the recommendations for repairs, additions, and maintenance on sections of roads that are not in accordance with the technical standards. The research was conducted by observing existing field conditions based on The Road Function Feasibility Implementation Instructions No. 09/P/BM/2014 Directorate General of Highways Ministry of Public Works. The results of the research on 3 (three) national roads conclude that: (006) Kulon Progo – Yogyakarta City Boundary, (008) Yogyakarta – Piyungan, (016) Sleman – Yogyakarta City Boundary everything has conditional function-worthy categories with recommendations (LS). The eligibility category further action for each road section is to provide recommendations for repair, addition, and maintenance in every technical test that does not fulfill the technical testing standard
THE EFFECTIVENESS OF THE REHABILITATION AND RECONSTRUCTION PROGRAM FOR POST-EARTHQUAKE COMMUNITY HOUSES IN NORTH LOMBOK REGENCY IN 2018 Ilhamius Hamit; Ashar Saputra; M. Fauzie Siswanto
Jurnal Pensil : Pendidikan Teknik Sipil Vol 12 No 3 (2023): Jurnal Pensil : Pendidikan Teknik Sipil
Publisher : LPPM Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jpensil.v12i3.35114

Abstract

Data published by the Government of Nusa Tenggara Barat Province in 2021, the progress of earthquake-resistant house construction in Lombok Utara Regency until July 9th, 2022, has completed 41,750 heavily damaged houses, 1,029 moderately damaged houses and 298 lightly damaged. From the data, there are still 9,040 houses whose physical progress is still in the implementation stage. This research aims to determine the effectiveness of rehabilitating and reconstructing the community houses post-Lombok Earthquake in 2018. The research method used in this research is a descriptive quantitative method with a purposive sampling technique. The research variables were taken from Perka BNPB No. 11 Tahun 2008 and adjusted with existing research objectives. The variables were Program Readiness, Program Planning, Program Implementation, and Program Monitoring and Evaluation. The sample in this research was 100 respondents from the earthquake-affected Lombok 2018 community who received earthquake-resistant house assistance and facilitators who assisted in the housing construction. Data collection in this research was conducted in Lombok Utara Regency through questionnaires, observations, and interviews. The data analysis used in this research was using the Likert scale. The research results show that the Post Disaster Community House Rehabilitation and Reconstruction Program in Lombok Utara Regency 2018 has run quite effectively. The average analysis of effectiveness using the Likert scale yields 66.83% for program readiness, 71.60% for program planning, 71.4% for program implementation, and 69.53% for program monitoring and evaluation. The average effectiveness rate produced in this research was 69.84%.