p-Index From 2020 - 2025
0.408
P-Index
This Author published in this journals
All Journal Jurnal Titra
Prayonne Adi
Industrial Engineering, Petra Christian University, Surabaya

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perancangan Transportation Management System pada PT. X Grace Natasha; Prayonne Adi
Jurnal Titra Vol 9, No 2 (2021): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT.  X is a company that engaged in the production and distribution of motorbikes.  This research was conducted in the LDD department, where the department supports the distribution process of motorcycle at PT.  X. The role of the LDD department is to ensure the distribution process of motorbikes, so that motorbikes can reach the hands of consumers well.  The LDD Department expects a working system that is more effective, efficient, and transparent in monitoring so that units that are not unfilled are low.  Problems will be identified by using fishbone diagrams, where the results of the identification are found to be three main problems that occurs in the LDD department.  The main problem is the opening of DO is not in accordance with the capacity of the truck, the truck does not come to take up the DO units that have been opened, and the trucks that come cannot be carried out the loading process directly.  The improvements are made by digitizing the distribution process by Logistic 4.0 principle or designing the Transportation Management System (TMS).  TMS is a system designed with the aim that the distribution process can be easily tracked and monitored.  TMS will also connect related parties that previously sought manually.  The distribution process is expected to be improved to be more effective, efficient and transparent
Perancangan Sistem Penentuan Lead Time Produksi Berdasarkan Kapasitas dan Waktu Baku pada PT. X Kevin Kusuma Prawiro; Prayonne Adi
Jurnal Titra Vol 9, No 2 (2021): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. X is a subsidiary of PT Astra Otoparts engaged in the automotive industry inproducing motorcycle chains, engine chains, filters, and accessories for motorbikes. PT. X has 2customer chain products, namely OEM (Original Equipment Market) products which includeAstra Honda Motor (AHM), Yamaha, Kawasaki, and Suzuki. RM Products (ReplacementMarket) which include Honda Genuine Part (HGP) and Yamaha Genuine Part (YGP). The chainof OEM products is a chain that will be installed directly on a motorcycle during the assemblyprocess. The RM product chain is a spare parts chain that will be marketed in motorcycledealers. Determining the standard time and production capacity of each process aims todetermine the production lead time. Production lead time is needed by the company to determinea product from the start of the raw material being processed to the end of being a chain product.The results of the calculation of the standard time of each process can be analyzed as the cause ofthe delay in product distribution to the customer. The results of this study are used to determinethe production lead time for a certain period with the number of stock components, the numberof chain stocks used for production plans for a certain period. The production plan uses data fromthe calculation of the standard process time and process capacity used to determine theproduction lead time.