This Author published in this journals
All Journal Jurnal Titra
Vanessa Angela Chionardes
Industrial Engineering Department, Petra Christian University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perancangan Sistem Pemantauan untuk Meningkatkan Pencapaian Realisasi dengan Perencanaan Painting di PT X Vanessa Angela Chionardes; I Gede Agus Widyadana
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X as a company that produces various types of bicycles has problems which one of them is painting process that does not produce output on time and in the right amount according to PPIC’s schedule. Based on Fishbone Diagram and Pareto Chart analysis, the most affecting factors are method, material, and environment.  The method factor is repair work has not been monitored well so there might be work delay. The monitoring system design in this research begins with improving the flow, then continued with the making of SOP and database in Google Sheets. The average percentage of realization accomplishment with planning from February until March (before implementation) is 32.09% and it increases to 50.01% from April until May (after implementation). Monitoring system can also show painting repair team performance that is presented by the percentage of daily repair accomplishment that has an average of 72.13% in April and 52.62% in May which is still below the target.