Claim Missing Document
Check
Articles

Found 3 Documents
Search

Perancangan Tata Letak Fasilitas Lantai Produksi Pada Pembuatan Sepatu Dengan Menggunakan Metode Systematic Layout Planning CV. Sinar Persada Karyatama Al Ikbal Arbi; Harry Rendra; Ari Wijaya
IKRA-ITH Teknologi Jurnal Sains dan Teknologi Vol 6 No 3 (2022): IKRAITH-TEKNOLOGI Vol 6 No 3 November 2022
Publisher : Fakultas Teknik Universitas Persada Indonesia YAI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37817/ikraith-teknologi.v6i3.2305

Abstract

Permasalahan dalam penelitian ini ialah jarak antar stasiun kerja, ketidakteraturan tata letak fasilitas, dan perpindahan material yang tidak menggunakanalat bantu di CV. Sinar Persada Karyatama. Perancangan tata letak fasilitasdilakukan dengan tujuan mengidentifikasi kondisi tata letak awal dan merancangulang tata letak untuk meminimalkan jarak perpindahan material antar stasiunkerja serta ongkos material handling yang dihasilkan. Metode yang digunakandalam perancangan ulang tata letak dalam penelitian ini adalah metodesystematic layout planning (SLP), metode ini menggunakan 3 alternatif usulan.Tahapan yang dilakukan metode ini adalah mengidentifikasi aliran material,menghitung kebutuhan luas ruang, menghitung jarak antar stasiun kerja sertafrekuensi perpindahan material, menghitung ongkos material handling danmemilih alternatif usulan dengan jarak dan biaya material handling yang lebihminimum. Hasil penelitian pada metode systematic layout planning (SLP) didapatkondisi tata letak di CV. Sinar Persada Karyatama memiliki permasalahanketidak teraturan tata letak fasilitas, dan material handling. Pada jarak antarstasiun kerja, dan perpindahan material yang dilakukan antar stasiun kerja.Rancangan ulang tata letak yang terbaik adalah dengan menggunakan metodesystematic layout planning (SLP) pada alternatif usulan I dengan total ongkosmaterial handling dalam waktu satu minggu sebesar Rp. 81.774,-.
Analisis Performance Elevator Studi Kasus Di Pasar Grosir Tanah Abang (Blok A) Menggunakan Metode Dan Graphic Mechanical And Electrical Equipment (Mee) Dan Perhitungan Empiris Tegar Prassetyo; Al Ikbal Arbi
IKRAITH-Teknologi Vol 7 No 1 (2023): IKRAITH-TEKNOLOGI Vol 7 No 1 Maret 2023
Publisher : Fakultas Teknik Universitas Persada Indonesia YAI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37817/ikraith-teknologi.v7i1.2316

Abstract

Tanah Abang Blok A Wholesale Market is a modern wholesale center in Jakarta that has more than 10floors and to make it easier for visitors to carry out activities that move the first floor j another floor, a verticaltransformation is needed, namely an elevator. Elevators are needed to streamline the time, mileage, and userpower to reach the first floor to other floors in a high-rise building. So in this Tugas Akhir the author takes thetitle Analisis performance elevator case study in Pasar grosir Tanah Abang block A. The method used is to usethe method of literature, observation, and interviews so that it is hoped that the author will be able to make iteasier to analyze it. In this study, the problems that will be discussed are the carrying capacity of the elevator,the waiting time of the elevator, the power of the motor, and the number of units. From this study, the followingresults were obtained for the elevator carrying capacity of 118 people for passenger elevators and 120 people forfreight elevators, waiting times for passenger elevators for 43.4 seconds and for freight elevators for 62.9 seconds,motor power for passenger elevators of 15 KW and freight elevators of 18 KW, and the number of units as manyas 4 units for passenger elevators and as many as 3 units for freight elevators.
Perancangan Bangunan Kampus di Jakarta dengan Pendekatan Arsitektur Hijau Ari Wijaya; Fadhil Mushawwir; Al Ikbal Arbi; Harry Rendra
IKRAITH-Teknologi Vol 7 No 2 (2023): IKRAITH-TEKNOLOGI Vol 7 No 2 Juli 2023
Publisher : Fakultas Teknik Universitas Persada Indonesia YAI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37817/ikraith-teknologi.v7i2.2329

Abstract

Indonesia adalah salah satu negara yang memiliki ibu kota yang minim akan ruang hijaunya.Setiap pembangunan mayoritas tidak terlalu mementingkan keberadaan ruang hijau di sekitarbangunan ditambah lagi akan polusi udara yang terus meningkat setiap tahunnya, oleh karena itu dakonsep arsitektur hijau menjadi salah satu solusi yang tepat untuk pada perencanaan suatu bangunandi daerah Jakarta, apalagi bangunan yang dapat dikatakanmembutuhkan lahan yang luas dan terdapataktifitas yang padat didalamnya. Universitas disebut sebagai roda penggerak inovasi danpengembangan teknologi dengan pendekatan triple helix dalam hilirisasi riset, yaitu sinergi antarapemerintah, swasta dan perguruan tinggi. Permasalahan dalam mendesain suatu bangunan kampusumumnya dihadapi pada masa sekarang adalah sumber vegetasi ataupun ruang hijau menjadiberkurang bersamaan dengan perkembangannya pembangunan di setiap daerah, yang manapermasalahan tersbut dapat berpengaruh besar atau memiliki efek samping terhadap lingkungandimana bangunan tersebut di bangun. Metode yang digunakan adalah metode dokumentatif.Perencanaan dan perancangan yang dimaksud adalah untuk membuat suatu wadah atau fasilitas yangdapat menampung kegiatan pendidikan dalam penyediaan fasilitas proses belajar dan mengajar baikformal maupun non formal, teoritis maupun praktik.