p-Index From 2020 - 2025
0.702
P-Index
This Author published in this journals
All Journal Ulil Albab
Lia Nursaadah
Universitas Perjuangan Tasikmalaya

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Pengaruh Jumlah Persediaan Bahan Baku dan Jam Kerja Tenaga Kerja terhadap Volume Produksi : Studi Kasus pada Konveksi Seragam Sekolah Delisht Colection Lia Nursaadah; Suci Putri Lestari; Barin Barlian
ULIL ALBAB : Jurnal Ilmiah Multidisiplin Vol. 1 No. 11 (2022): Oktober 2022
Publisher : CV. Ulil Albab Corp

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56799/jim.v1i11.900

Abstract

This study aims to determine and analyze the effect of the variable amount of raw material inventory and labor hours on production volume. The research method used is the quantitative method and the data used is secondary data obtained directly through interviews with company owners. In this study, sampling used a periodic data approach with a semester scale of 20 samples. The variables used in this study are two independent variables and one dependent variable, so the most appropriate analysis tool is multiple linear regression. Based on the results of multiple linear analyses, it is known that the amount of raw material inventory and labor hours simultaneously and partially have a significant effect on production volume. It can also be seen from the company's data that with every increase in the cost of controlling the number of raw materials and labor hours, the production volume also increases. The calculation results show that there is a very strong relationship between the variable amount of raw material inventory and labor hours in increasing production volume.