THE ROUTINE MAINTENANCE PLANNING CONSULTANCY FOR PANGKAH KULON - BOOLO ROAD, LOCATION: UJUNGPANGKAH DISTRICT, GRESIK REGENCY Achmad Lukmanul Khakimin; Budi Witjaksana; Hanie Teki Tjendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.479

Abstract

Road infrastructure is the lifeblood of a region's economy because it connects and increases the movement of people and goods. Traffic jams in the city of Gresik fall into the severe category. This is evidenced by the long queues of vehicles and the time it takes to decompose traffic jams for hours. The Gresik Regency Government, through the Highways Public Works and Water Resources Office, needs to carry out systematic and appropriate planning to overcome the above problems. Maintenance is carried out by preparation, topographic survey, traffic survey, and then the calculation of the pavement plan. From the analysis results obtained CBR subgrade = 3%; DDT = 4; IP = 2.5; FR = 1.0; LER = 2.18; ITP = 9.5; Ipo = 3.9 – 3.5. After the calculations, we obtained a 10 cm asphalt surface layer (4 cm ACWC, 6 cm ACBC) and 20 cm CTB fill for leveling.
PROJECT SCHEDULING ANALYSIS USING THE CRITICAL PATH METHOD – CASE STUDY: SUBSIDIZED HOUSE CONSTRUCTION PROJECT IN HILL MULYA HOUSING, SAMARINDA CITY Gilang Ramadhan Rakasyiwi; Budi Witjaksana; Hanie Teki Tjendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.480

Abstract

Samarinda City has a total of 123 housing estates with 20 subsidized housing (MBR) and 4 mixed housing. Project scheduling in construction greatly determines the project's success because it is a benchmark that the project is successful within the allotted time. CPM (Critical Path Method). CPM is a method that introduces an element of project time by using a predefined activity time estimate. This method is used for crushing the Bukit Mulya housing project, which only applies to the implementation of crash time. From the analysis results, the initial scheduling time, which was originally 87 days, was trimmed by 9 days using CPM, the optimal time was 78 days.