Claim Missing Document
Check
Articles

Found 1 Documents
Search

ISU LINGKUNGAN PEMBANGUNAN JARINGAN TRANSMISI SUTT 150 KV PLTP KARAHA BODAS KE GI MALANGBONG, KABUPATEN TASIKMALAYA DAN GARUT, PROPINSI JAWA BARAT -, Achmad Syafrudin
Bulletin of Scientific Contribution Vol 8, No 2 (2010): Bulletin of Scientific Contribution
Publisher : Fakultas Teknik Geologi Universitas Padjadjaran

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (887.905 KB) | DOI: 10.24198/bsc.v8i2.8248

Abstract

The plan construction Transmision line SUTT 150 KV of the PLTP Karaha Bodas at (Sub-District of Kadipaten) to Mainhouse Electricity Malangbong (Sub-District Malangbong) will raise effects to the environment. Identification are the stage of the potential impact before EIA study. Identification is one of the stage to get isues in the field to minimize all the effects that will appear in the future to support sustainable development.