Analysis of Cost and Time Using Earned Value on the Boarding School Construction Project at SMA Muhammadiyah 3 Tulangan Sidoarjo Titik Nurkaruniati; Budi Witjaksana; Hanie Teki Tjendani
Eduvest - Journal of Universal Studies Vol. 4 No. 9 (2024): Journal Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v4i9.3792

Abstract

Effective project management is crucial for the successful completion of construction projects, including the construction of a dormitory at SMA Muhammadiyah 3 Tulangan. Challenges such as design changes, adverse weather conditions, and limited labor resources impact the project's progress. The Earned Value Method is used to monitor project performance by analyzing indicators like BCWS, BCWP, ACWP, SV, CV, SPI, and CPI. This analysis shows that the project initially experienced delays and exceeded budget costs, but the situation improved significantly over time. Despite weekly variations in costs, the project remained on a financially manageable track. The conclusion from this analysis is that while the project faced time delays, cost performance remained under control. Recommendations for improvement include more thorough planning, better resource management, and quicker responses to changes.
Analysis Of The Earned Value Method on the Road and Bridge Preservation Project in Situbondo-Ketapang-Banyuwangi Javan Agustian Setyagraha; Budi Witjaksana; Hanie Teki Tjendani
Eduvest - Journal of Universal Studies Vol. 4 No. 9 (2024): Journal Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v4i9.3793

Abstract

The implementation of the Situbondo – Ketapang – Banyuwangi Road and Bridge Preservation Project experienced changes in the area being worked on, requiring additional design. Issues arose when the overlay asphalt mix work was halted to await test results for Aspal Modiv PG – 70 from the Pusjatan Bandung Road Materials Laboratory, causing a delay in the 40th week by -0.813%. Delays primarily occurred in the AC - WC and AC - BC asphalt work, affecting project performance. A cost and time analysis was necessary to address this issue. The Earned Value Method (EVM) was used to determine the project's duration and cost until initial handover. The study results indicated that the project cost performance with a CPI > 1 was good, but an SPI of 0.983 < 1 indicated delays. The estimated final project cost is Rp 112,439,121,070.91, with an estimated completion time of 453 days, 3 days longer than the planned schedule.
Cost and Time Analysis Using the Earned Value Analysis Method Sugeng Hariyadi; Hanie Teki Tjendani; Budi Witjaksana
Eduvest - Journal of Universal Studies Vol. 4 No. 9 (2024): Journal Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v4i9.6402

Abstract

Construction project management prioritizes the achievement of three main objectives: cost, quality, and time. This study evaluates a road widening project in Mojokerto Regency with a target completion time of 150 days. To prevent delays and cost overruns, researchers used the Earned Value method to identify early warnings regarding project performance. This method integrates time and cost values through measurements of Cost Variance (CV), Schedule Variance (SV), Cost Performance Index (CPI), Schedule Performance Index (SPI), Estimated at Completion (EAC), and Estimated Schedule at Completion (EAC). The research findings show that additional costs required (ETC) reached Rp 3,276,704,110.14, with additional time (ETS) up to week 12 being 87 days. The change in project costs (EAC) reached Rp 3,961,767,811.01 from the contract cost, while the project completion time (EAS) was 171 days. The analysis indicates that the construction service provider has implemented an efficient implementation method with consistent supervision, ensuring the smooth progress of the project.
Analysis of Structural Behavior with Stage Construction Analysis Method Compared to Conventional Analysis on Tegalalang Bali Real Estate Building I Wayan Gunawan; Hanie Teki Tjendani; Ar. RA. Retno Hastijanti
Jurnal Teknik Indonesia Vol. 5 No. 1 (2026): Jurnal Teknik Indonesia
Publisher : Publica Scientific Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58860/jti.v5i1.797

Abstract

Conventional structural analysis methods have shortcomings because they assume construction is complete, leading to overestimation in columns and walls. Deformation occurs due to self-weight, altering heights during casting, alongside creep (inelastic deformation from constant loads) and shrinkage (volume change from water loss). Thus, stage construction analysis (SCA) is essential. Analysis followed SNI requirements for shear force (V), vibration period (T), displacement (????), and stress ratio. Structural elements were grouped by construction stages and contours. In SCA, dead and additional dead loads are defined non-linearly, matching stages. SCA increases displacement/deformation by 43% (x-direction), 39% (y), and 44% (z), iron work volume by 7%, and internal forces, reducing column capacity by 27.7% on average. Differences from conventional methods arise because SCA models groups per construction stages, using Nonlinear Stage Construction Load Case for self-weight and dead loads, unlike Static Linear Load Case.
Time and Cost Analysis Using the Critical Chain Project Management Method in the Retrofitting Work of the East Java Province Human Rights Office Building into a Green Building Christio Aji Sasongko; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 9 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i9.568

Abstract

The retrofitting work of the East Java Province Public Works Office Building into a Green Building encountered several obstacles during the construction process that caused delays in the execution of the work. Therefore, scheduling control is needed using the Critical Chain Project Management method. CCPM aims to manage scheduling design and process control by concentrating on eliminating multitasking, Parkinson's Law, and student's syndrome, which have been considered to cause suboptimal field work execution time and increased waste in terms of time. CCPM also has a buffer mechanism used in scheduling as a tool to protect project schedules from uncertainty, ensuring that every task can be completed on time. By using the Critical Chain Project Management method, a project buffer value of 26 days and a feeding buffer of 11 days were obtained, so that the original work duration of 180 days would become 143 days if the entire buffer of 37 days was not applied. The implementation cost with a value of Rp. 32,048,830,700 can be more efficient at Rp. 30,584,593,995 if the entire buffer is not used, with a project buffer saving of Rp. 1,028,923,090 and feeding buffer savings of Rp. 435,313,615, resulting in a total work cost savings of Rp. 1,464,236,705.
Cost Analysis of Additional Construction Time for the Office Building of the Religious Court of Trenggalek Regency East Java Nidya Widyaningsari; Hanie Teki Tjendani; Sajiyo Sajiyo
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 9 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i9.573

Abstract

This study investigates the cost implications of accelerating the construction of the Trenggalek Religious Court Office Building in response to delays caused by flooding. Utilizing the crashing method, two acceleration strategies were evaluated: adding overtime hours and increasing workforce. The results indicate that reducing the project duration from 240 days to 180 days through overtime incurs a cost increase primarily due to additional pay, while reducing it to 170 days by adding workers results in higher labor costs. Detailed analysis of durations, costs, and cost slopes for each activity provides valuable insights for project managers to select the most cost-effective acceleration approach. Additionally, a comparative analysis of normal and crashing schedules for various construction tasks highlights potential efficiencies in scheduling and budgeting, ultimately aiding in timely project completion within optimized costs.