Yudi Pramono
1) Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology N1-18, 2-12-1 Ookayama, Meguro-ku, Tokyo, 152-8550 Japan. 2) Nuclear Energy Regulatory Agency of Indonesia Jl. Gadjahmada 8, Jakarta, 10120 Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

7 MPa Commissioning of Two-phase Flow Loop for Pb-Bi Cooled Direct Contact Boiling Water Small Fast Reactor Yudi Pramono; Minoru Takahashi; Hiroshi Sofue; Megumi Matsumoto; Fei Huang
Indonesian Journal of Physics Vol 16 No 1 (2005): Vol. 16 No.1, January 2005
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1459.156 KB)

Abstract

One of key issues for the development of the Pb-Bi cooled direct contact boiling water small fast reactor (PBWFR) is thermal-hydraulics. In order to solve the issues of thermal-hydraulics, Pb-Bi-water direct contact boiling two-phase flow loop was designed and constructed, where the loop consisted of a Pb-Bi flow loop, four-heater pin bundle, a chimney, an upper tank with a separator and a dryer, an electromagnetic flow meter, a dump tank, and water supply system, and was operated at the pressure of 7 MPa. Pb-Bi was charged from the dump tank into the Pb-Bi flow loop. Water was circulated by a pump through a preheater, the chimney, the upper tank, a condenser, a buffer tank, and a cooler. A subcooled water was injected into the Pb-Bi in the chimney. Before achieving the next operation phase, commissioning stage was conducted including obtaining of optimal condition of loop, being focused on achievement of the commissioning of the system up to 7 MPa. The experimental results show that steam pressure of 7 MPa was achieved at steam temperature of 286 oC under the saturation condition.