Claim Missing Document
Check
Articles

Found 3 Documents
Search

Model Persamaan Kumulatif Muatan dan Tinggi Draft Tongkang Terhadap Kumulatif Cycle Time Batu Bara di Pelabuhan Karya Citra Nusantara Marunda Geby Thesya Paskarina; Hartati M Pakpahan
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5582

Abstract

AbstractKarya Citra Nusantara Marunda Port is one of the ports that is a port business entity in Indonesia; this port can carry out bulk products unloading activities, including coal, sand, and others. The quantity of cargo in the barge increases as the draft of the barge falls, and vice versa; when the draft of the barge begins to rise, the amount of cargo drops gradually and the excavator's unloading time increases. Considering this, research must be done to ascertain the mathematical model relating to the duration of coal unloading at Marunda Port and to establish the cumulative impact of cargo volume and barge draft height. A multiple linear regression equation model was created for the time of coal unloading using the enter method, Y = -152.076 + 16.157X1 - 148.304X2, based on the findings of the analysis of traditional assumptions and hypotheses that was conducted as a prerequisite for creating a good equation model. The unloading cycle time will be 152,076 minutes shorter with the unloading time per barge when the amount of cargo per tonne drops. The needed unloading cycle time will be increased if the cargo volume rises by 16,157 tons.Keywords: port, unloading time, cycle time, total load, draft height, multiple linear regression
Model Persamaan Kumulatif Muatan dan Tinggi Draft Tongkang Terhadap Kumulatif Cycle Time Batu Bara di Pelabuhan Karya Citra Nusantara Marunda Geby Thesya Paskarina; Hartati M Pakpahan
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5582

Abstract

AbstractKarya Citra Nusantara Marunda Port is one of the ports that is a port business entity in Indonesia; this port can carry out bulk products unloading activities, including coal, sand, and others. The quantity of cargo in the barge increases as the draft of the barge falls, and vice versa; when the draft of the barge begins to rise, the amount of cargo drops gradually and the excavator's unloading time increases. Considering this, research must be done to ascertain the mathematical model relating to the duration of coal unloading at Marunda Port and to establish the cumulative impact of cargo volume and barge draft height. A multiple linear regression equation model was created for the time of coal unloading using the enter method, Y = -152.076 + 16.157X1 - 148.304X2, based on the findings of the analysis of traditional assumptions and hypotheses that was conducted as a prerequisite for creating a good equation model. The unloading cycle time will be 152,076 minutes shorter with the unloading time per barge when the amount of cargo per tonne drops. The needed unloading cycle time will be increased if the cargo volume rises by 16,157 tons.Keywords: port, unloading time, cycle time, total load, draft height, multiple linear regression
Faktor-faktor yang Mempengaruhi Waktu Siklus Bongkar Batu Bara di Pelabuhan Karya Citra Nusantara Marunda Lesti Septianingrum; Hartati M Pakpahan; Pradhana W Nariendra
Warta Penelitian Perhubungan Vol. 35 No. 2 (2023): Warta Penelitian Perhubungan
Publisher : Sekretariat Badan Penelitian dan Pengembangan Perhubungan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25104/warlit.v35i2.2232

Abstract

Marunda merupakan wilayah di Jakarta Utara yang mempunyai pelabuhan curah kering di Indonesia. Salah satu pelabuhan curah kering di Marunda yaitu Pelabuhan Karya Citra Nusantara. Dalam kegiatan bongkar terdapat kendala pada kecepatan waktu sehingga akan berdampak pada lama waktu kapal sandar dan kecepatan pengiriman barang. Dengan adanya Pelabuhan KCN diharapkan dapat membantu menurunkan dwelling time yang ada di Pelabuhan Tanjung Priok. Pelabuhan KCN dapat membongkar batu bara selama 2 hingga 3 hari, kecepatan bongkar ini diharapkan lebih cepat sehingga dapat menurunkan biaya bongkar. Penelitian ini akan meneliti beberapa tongkang dengan beberapa faktor yang diduga menjadi faktor-faktor yang mempengaruhi waktu bongkar batu bara  menggunakan metode regresi linear berganda stepwise, yang mana akan diuji juga berupa uji normalitas, homoskedastisitas, non multikolinearitas, uji kebaikan model, uji T, dan uji F variabel dependen yang digunakan yaitu cycle time (CA), dan variabel independen idle time (IT) , jumlah muatan (JM), tahun produksi excavator (TPE), dan cuaca (CA). Hasil penelitian menunjukan bahwa model regresi linear pada keseluruhan tongkang yaitu Y = -24.856 + 1.076 JM – 0.630 TPE – 0.437 CA.