This Author published in this journals
All Journal Jurnal Azimut
GHINIA ANASTASIA MUHTAR
Universitas Bosowa

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Lokasi Pembangunan Pembangkit Listrik Tenaga Bayu Menggunakan Metode SIG di Provinsi Gorontalo GHINIA ANASTASIA MUHTAR
Jurnal Azimut Vol 2 No 2 (2019): Desember 2019
Publisher : Universitas Tamansiswa Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (820.307 KB) | DOI: 10.31317/jaz.v2i2.491

Abstract

An analytical study is conducted on the potential of wind energy in Gorontalo Province for wind plant development considering that many developing countries had done so. Wind speed in each region in Gorontalo Province was statistically analyzed, identified potential areas, and calibrated wind speed to wind power density. Based on KTA value it results 3 category, namely good (20 watt/meter2 - 23 watt/meter2), enough (12 watt/meter2 - 20 watt/meter2) and poor (7watt/meter2 - 12 watt/meter2). Then only the KTA value in the good and enough category are used as the land suitability standard. Multi criteria used here is buffering technique by giving a distance between land that can be built by wind plant and land that cannot be built by wind plant. There are 6 layers used in multi criteria, 4 layers use buffering techniques (land use and land cover, land sanctuary, road and public transport terminal), while the other 2 are reclass (lereng and KTA). GIS is used for mapping the distribution of land suitability with the overlay and separation method. The results, total area of land suitability start from 1 hectar until 3.413 hectars. There are ten sub-disctricts which have land suitability more than 1.200 hectars, namely Kwandang, Dulupi, Anggrek, Bongomeme, Tibawa, Pulubala, Wonosari, Sumalata, Boliyohuto and Paguyaman (largest to smallest).