This Author published in this journals
All Journal Forum Geografi
Seno P. Sardjono, Seno P.
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Penggunaan Sistem Informasi Geografis untuk Menghitung Dimensi Lumpur Panas di Porong, Sidoarjo Pramono, Gatot H.; Sardjono, Seno P.
Forum Geografi Vol 21, No 2 (2007): December 2007
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The hot mud extrusion in Porong, Sidoarjo since May 29, 2006 has impacted many aspects including social, culture, economy and transportation. Several weeks later, a collaborative team was formed to investigate the factors controlling the hot mud extrusions. One important aspect is concerning the mud dimensions such as its perimeter, area, volume and discharge. Bakosurtanal was assigned to carry out this task. Field surveys to acquire the mud heights were conducted twice within one month interval. Geographic Information System (GIS) using 3 dimentional approach was employed to compute the mud dimesions. One of the results show that the mud discharge is about 50.000 m3/day. This value was later commonly used to refer the magnitude of the hot mud.
Penggunaan Sistem Informasi Geografis untuk Menghitung Dimensi Lumpur Panas di Porong, Sidoarjo Pramono, Gatot H.; Sardjono, Seno P.
Forum Geografi Vol 21, No 2 (2007): December 2007
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/forgeo.v21i2.2359

Abstract

The hot mud extrusion in Porong, Sidoarjo since May 29, 2006 has impacted many aspects including social, culture, economy and transportation. Several weeks later, a collaborative team was formed to investigate the factors controlling the hot mud extrusions. One important aspect is concerning the mud dimensions such as its perimeter, area, volume and discharge. Bakosurtanal was assigned to carry out this task. Field surveys to acquire the mud heights were conducted twice within one month interval. Geographic Information System (GIS) using 3 dimentional approach was employed to compute the mud dimesions. One of the results show that the mud discharge is about 50.000 m3/day. This value was later commonly used to refer the magnitude of the hot mud.