p-Index From 2020 - 2025
0.408
P-Index
This Author published in this journals
All Journal Politeknosain
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Pengolahan Data Pengiriman Paket di PT. Maji – Salatiga dengan Pemrograman Visual Basic Didik Warasto
Politeknosains Vol 19 No 2 (2020): Jurnal Politeknosains Volume 19 Nomor 2 - September 2020
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Politeknik Pratama Mulia Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (590.272 KB)

Abstract

Data-Processing of Package Delivery In PT. MAJI - Salatiga use the programming language visual basic 6.0. with the progress of information technology in this time computer play a part very important in the world of job. In technological growth this computer can assist the us in producing and to save information in a complex system information. In general computer used for the hollowing of duty like typing, but in fact knowledge about computer need more developing so that can overcome the problems which complex progressively. As for one of example of problems able to be overcome with the computer peripheral that is problems of delivery of goods package that happened in PT. MAJI - Salatiga By using programming language of visual basic 06, in this paper writer hope can assist the PT. MAJI - Salatiga in solving problems of delivery of goods package especially, so that will get the data and report which quickly, precisely and accurate. By using input of scrip certificate transaction, town data, data of tariff of package and transaction claim so that can complete the process which have there.
Visual Dashboard Program Penjualan pada Usaha Kecil Menengah (UKM ) Mutiara Surakarta dengan Visual Basic dan Crystal Report Didik Warasto; Martono
Politeknosains Vol 19 No 1 (2020): Jurnal Politeknosains Volume 19 Nomor 1 - Maret 2020
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Politeknik Pratama Mulia Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (841.555 KB)

Abstract

This paper discusses improving the sales system that has been used by UKM Mutiara Surakarta. Using the field study method. The field study is carried out by researching the company directly. This is done to obtain data and information directly with the problem under study. The field study is carried out by studying the information system developed by UKM Mutiara, as well as collecting data about information systems implemented by UKM UKM. The result is an inventory program designed using Visual Basic 6.0. With the creation of this program, the processing of inventory information systems implemented by UKM Mutiara Surakarta can be faster, more accurate, easier and obtain updates, especially in the inventory system.
DSS (Decision Support System) Penilaian Kinerja Mahasiswa dengan Profile Matching Didik Warasto
Politeknosains Vol 16 No 2 (2017): Jurnal Politeknosains Volume 16 Nomor 2 - September 2017
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Politeknik Pratama Mulia Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1021.622 KB)

Abstract

This research aims to design a teaching materials for increasing motivation and learning achievement of the students in Microcontroller course, Department of Electronics Engineering, Politama Surakarta. It also aims to identify effects of using Arduino Kit teaching materials in motivation and learning achievement. Data is taken from 2 groups of Assembly Language course, each has 32 students. Research instruments use questionnaire, pretest and post-test. The questionnaire uses 5-point Likert Scale. The pretest and post-test use objective test with 4 options. Data is collected and analyzed with SPSS v23. Homogeneity and normality test are used before testing hypothesizes. Hypothesizes are tested with nonparametric statistics Mann-Whitney U-Test. Research results show that the use of Arduino Kit instructional media has positive impact on both motivation and learning achievement. The average score of motivation of the treatment group (72,90) is higher than the average score of motivation of the control group (68,19). Results also show that the post-test average learning achievement of the treatment group (26,49) is higher than the average learning achievement of the control group 22,03.
Positioning dengan Teknologi Bluetooth Mengunakan Naïve Bayes Algoritma Yusuf Eko Rohmadi; Taman Ginting; Didik Warasto
Politeknosains Vol 15 No 1 (2016): Jurnal Politeknosains Volume 15 Nomor 1 - Maret 2016
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Politeknik Pratama Mulia Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (539.52 KB)

Abstract

Bluetooth has emerged as a viable choice of technology in indoor positioning systems due to the increase in the number of Bluetooth-enabled devices over the last decade. Bluetooth was initially developed as a cable replacement technology but properties such as low cost and high availability has led to the development of several indoor positioning systems relying on Bluetooth signals. The characteristics of the Bluetooth device’s RSSI (Received Signal Strength Indication) value were analyzed in preliminary experiments. According to the results of these experiments, the proposed method combines processing using RSSI value threshold and handling of instantaneous variation of RSSI value. Fingerprint data retrieval is done with each grid size 1m x 1m and 2m x 2m. RSSI measurements performed at room Politeknik Pratama Mulia Surakarta. Determination of the estimated location of the object is determined using Naïve Bayes algorithm From the research known influence on the measurements include a fingerprint grid sizes, algorithms and extensive amount of data from the fingerprint data measurement locations. The best results of testing of algorithms to generate distance 1m greatest accuracy. From the results with 1 meter got the result of 1.6 meters and 2 meters with 2:04 to scenario 2 results will be the first got the result 1.85m m2 and 2 m2 with the results of 2.06 The test results of unknown size on the grid one meter better than 2-meter grid.