Claim Missing Document
Check
Articles

Found 2 Documents
Search

Optimalisasi Waktu dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM) Bobby Damara; Rasio Hepiyanto
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 1 (2021): JUNE
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2745.604 KB) | DOI: 10.30737/jurmateks.v4i1.1735

Abstract

Cost and time control is a key aspect of construction management. In its planning, both aspects need to be done appropriately to get optimal results. Building construction cannot be separated from various obstacles that cause delays in work until the cost of repairs. This research aims to optimize the cost and time in the Blitar National Land building by using the CPM (Critical Path Method) Method. The method is applied by using Microsoft project software to find out the critical paths are located in each division of the work by creating network diagrams and delayed scenarios. The results of the study obtained critical pathways occurred inactivity (A, B, C, D, E, G, H, I, L and M). From the critical path, an increase in the number of workers and the duration of work (overtime) to prevent delays. The prevention takes a fee of Rp 290,617,244 with the duration of work (Activity B) requires 15 additional workers, 8 hours of overtime.   (Activity C) it takes 3 additional workers and 1hour additional overtime time and on (Activity H) requires 6 additional workers with overtime for 1 hour.
Optimalisasi Waktu dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM) Bobby Damara; Rasio Hepiyanto
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 1 (2021): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i1.1735

Abstract

Cost and time control is a key aspect of construction management. In its planning, both aspects need to be done appropriately to get optimal results. Building construction cannot be separated from various obstacles that cause delays in work until the cost of repairs. This research aims to optimize the cost and time in the Blitar National Land building by using the CPM (Critical Path Method) Method. The method is applied by using Microsoft project software to find out the critical paths are located in each division of the work by creating network diagrams and delayed scenarios. The results of the study obtained critical pathways occurred inactivity (A, B, C, D, E, G, H, I, L and M). From the critical path, an increase in the number of workers and the duration of work (overtime) to prevent delays. The prevention takes a fee of Rp 290,617,244 with the duration of work (Activity B) requires 15 additional workers, 8 hours of overtime.   (Activity C) it takes 3 additional workers and 1hour additional overtime time and on (Activity H) requires 6 additional workers with overtime for 1 hour.