This Author published in this journals
All Journal Jurtik STMIK Bandung
Claim Missing Document
Check
Articles

Found 1 Documents
Search

SISTEM INFORMASI PENJADWALAN PROYEK MENGGUNAKAN METODE PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) DI CV. INFOTECHMEDIA Yus Jayusman; Murlinah Murlinah; Ogi Rizki Fadillah
JURTIK:Jurnal Penelitian dan Pengembangan Teknologi Informasi dan Komunikasi Vol 11 No 2 (2022): JURTIK: Jurnal Teknologi Informasi dan Komunikasi
Publisher : LPPM STMIK BANDUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1196.765 KB) | DOI: 10.58761/jurtikstmikbandung.v12i2.171

Abstract

CV. Infotech Media is a national private company with legal entity which is engaged in website, desktop andandroid-based software development services. At the time of construction, projects often experience delays inproject completion due to several factors, namely in determining the estimated work time, the determination of theestimated work time often experiences discrepancies because the determination of the time estimate still uses roughestimates and ignores the possibility of optimistic and pessimistic times. In addition, there is no system thatcalculates which jobs should be prioritized and which jobs can be postponed for some time. Based on the problemsthat occur today, a project scheduling information system is needed at CV. Infotech Media. The method used tosolve this problem uses the Program Evaluation and Review Technique (PERT) method to calculate the right timeestimate and determine the critical path where there is work that is prioritized or cannot be postponed. Based onthe test results achieved, the project scheduling information system has been able to overcome the problems thatexist in the company, namely, calculating the right time estimate, providing information about the critical pathand making a schedule in the form of a Gantt Chart