DAM COLLAPSE ANALYSIS (CASE STUDY: SINDANGHEULA DAM, SERANG REGENCY) Sudrajat Sudrajat; Bambang Priyambodo; Kristina Sembiring; Cahyadi Cahyadi; Ediyanto Arief
INFOKUM Vol. 10 No. 5 (2022): December, Computer and Communication
Publisher : Sean Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dam failure is defined as partial or complete collapse of the dam or its complementary structures and/or damage resulting in the non-functioning of the dam. Sindangheula Dam was built across the Cibanten River, which is located in Serut Village, Sindangheula Village, Pabuaran District, Serang Regency, Banten Province with a watershed area (DAS) of 74,46 km2, the length of the main river ± 16 km with a height difference between the highest point and the location of the dam ± 1672 m. Sindangheula dam is designed with a zoned embankment type consisting of the main dam and the koferdam which are integrated into one unit. Both have a zonal type of fill consisting of a vertical core, filter, transition and rockfill. The upstream slope is 1: 3,00 and the downstream slope is 1: 2,50. The dam is designed with an inflow discharge of 1000 th. As for the calculation of the program, according to the procedure, the Probably Maximum Flood (PMF) flood discharge is used of 861,94 m3/second. The main Sindangheula dam is assumed to have collapsed due to overtopping caused by continuous rains and the high discharge is the same as the PMF flood discharge. The hydrological analysis shows that at the PMF flood discharge of 861,94 m3/second, at the spillway crest elevation condition at +106,613 masl, the water will run over the top of the dam (overtopping) causing the dam to collapse completely. From the results of the running model, it can be seen that the pattern of flood flow that occurred due to the collapse of the dam, the flood occurred in almost all downstream of the dam which is an urban and densely populated area with inundation heights reaching 0,10 – 14,90 m, and a flow velocity of 0,01 – 58,16 m/s.
Analisis Penerapan Supplied By Owner Material Konstruksi Beton Terhadap Biaya Dan Tingkat Komponen Dalam Negeri (TKDN) Pekerjaan Konstruksi Jaringan Irigasi Ciwates: Analysis Of The Implementation Of Supplied By Owner Concrete Construction Materials On Cost And Domestic Component Level (TKDN): Ciwates Irrigation Network Construction Works Aditya Wibawa Mukti; Bambang Priyambodo; Pio Ranap Tua Naibaho
Media Ilmiah Teknik Sipil Vol. 14 No. 1 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/mits.v14i1.11588

Abstract

Amidst global food security challenges and post-pandemic economic fluctuations, the development of robust agricultural infrastructure has become an inevitable national priority, as outlined in Presidential Instruction Number 2 of 2025. However, fiscal realities at the regional level often present a paradox: the need for infrastructure rehabilitation is increasing while fiscal space is narrowing. This research highlights this phenomenon in Serang Regency, where the budget trend for irrigation management shows a significant decline from 2021 to 2025. This thesis proposes and tests the effectiveness of the Supplied by Owner (SBO) procurement method as a technocratic solution to bridge this gap. Through a case study approach on the Ciwates Irrigation Network Improvement project, this research conducts an in-depth comparative analysis of two key variables: construction cost efficiency and the optimization of Domestic Component Level (TKDN) in concrete works. The methodology combines contract document analysis, market price simulation, and material supply chain audit. The research results reveal empirical findings that the implementation of SBO is capable of generating a cost efficiency of 3.04% (equivalent to IDR 57,380,000.00) from a total conventional project value of IDR 1,886,459,000.00 to IDR 1,829,079,000.00. More significantly, this method proved to be a strong catalyst for increasing TKDN through the use of PT. Conch Cement Indonesia products, recording an increase of 9.21 percentage points from 52.18% to 61.39%. These findings confirm that SBO is not merely a savings mechanism, but a strategic instrument for quality control and the affirmation of national industrial policy. This study recommends the institutionalization of SBO in regional procurement regulations for material-intensive projects.