p-Index From 2021 - 2026
0.444
P-Index
This Author published in this journals
All Journal HTJ
Aria Hansen
Jurusan Teknik Sipil, Universitas Kristen Palangka Raya

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS METODE PELAKSANAAN KINERJA PADA PEKERJAAN PRESERVASI JALAN BATAS KOTA PANGKALAN BUN-PANGKALAN LADA (Analysis Of Performance Implementation Methods In Pangkalan Bun-Pangkalan Lada City Limit Road Preservation Work) Aria Hansen; M.Rafie Hamdi
Huma Tabalien Jurnal (HTJ) Teknik Sipil Vol 1, No 2 (2021): HTJ Desember 2021
Publisher : Fakultas Teknik Universitas Kristen Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (343.562 KB)

Abstract

The Directorate General of Highways through the Directorate of Road Preservation has implemented a new policy, namely road preservation using the long segment method for Indonesia's national roads. The long segment method aims to ensure that road pavements, shoulders, drainage systems, road auxiliary buildings and road equipment are at all times in a stable service condition based on the performance required in the contract documents. This research will discuss the suitability between expectations and the performance of Long Segment road preservation in the field using the Importance Performance Analysis (IPA) method. From the analysis of the IPA method by calculating the suitability between the level of performance received and the level of expectation for road performance, it will be known the satisfaction level of organizers and road users with the performance of Long Segment road preservation. The sample in this study were 10 expert respondents, from the Indonesian Bridge Road Development Association Professional Organization (HPJI), Academics, Commitment Making Officers (PPK), Consultants and Contractors. Keywords: Road, Terms of Reference, Long Segment
PERENCANAAN TARIF ANGKUTAN UMUM JURUSAN PALANGKA RAYA – TUMBANG HIRAN DALAM MASA PANDEMI ( COVID-19 ) (Planning Of Public Transport Rates Palangka Raya Department – Tumbang Hiranduring A Pandemic ( Covid-19 ) Aria Hansen; Robot .
Huma Tabalien Jurnal (HTJ) Teknik Sipil Vol 2, No 1 (2022): Vol 2, No 1 (2021): HTJ Februari 2022
Publisher : Fakultas Teknik Universitas Kristen Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (364.017 KB)

Abstract

The public force is a means of transportation needed by most urban/regional people, it is impossible for a city/region to live without public transportation. Taxi public transportation is one of the alternative public transportation in the district area, which provides other services and is not the same as other transportation. The purpose of this study is to determine the amount of Vehicle Operating Costs (BOK) for public transportation from Palangka Raya City to Tumbang Hiran Village, as well as to find out the amount of passenger fares in accordance with the Vehicle Operational Costs (BOK) issued. Based on the results of the analysis of Vehicle Operational Costs (BOK), the total basic costs per day for general passengers for the City of Palangka Raya Towards Tumbang Hiran Village are: Innova cars of Rp. Hiran is Rp. 150,305.28/person/trip. The basic fare for public transportation heading from Palangka Raya City to Tumbang Hiran Village is IDR 165,335.66/org/rit. While the tariff at the time this research was conducted was Rp. 350,000 total revenue per day at a rate of Rp. 350,000 x the number of trips per day was Rp. 1,400,000 / person / person. The two transportation vehicles above provide a decent opinion for the manager / owner For passengers, the price is reasonable, feasible and affordable because it is in accordance with the time and distance traveled. Keywords: Public Transportation / Taxi, Vehicle Operational Cost (BOK) per km, Total cost