Brian Tony
Universitas Pembangunan Nasional "Veteran" Yogyakarta

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

TUBING STRENGTH ANALYSIS AND FAILURE ASSESSMENT OF ELECTRICAL SUBMERSIBLE PUMP (ESP) WELL: A CASE STUDY ON PRODUCTION WELL “X” Brian Tony; Steven Chandra
Jurnal Mineral, Energi dan Lingkungan Vol 6, No 2 (2022): Desember
Publisher : Fakultas Teknologi Mineral, Universitas Pembangunan Nasional (UPN)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jmel.v6i2.7701

Abstract

This study will discuss the evaluation of tubing strength in Well X that using Electrical Submersible Pump as an artificial lifting method. The evaluation will be carried out to determine the risk of failure of production tubing due to erosional damage and the failure due to loads on tubing during production operation using Electrical Submersible Pump. Burst, collapse, and tension loads will be the main focus in evaluating the tubing load by considering the worst conditions that may be experienced during production operation. The calculation of the tubing load is done using Microsoft Excel. The result of tubing load calculation will be compared with the tubing rating based on tubing grade. Erosional damage prediction is carried out using software to determine the erosional velocity on the production tubing.This study will evaluate the production tubing used in Well X with an outer diameter of 3.5 inch and L-80 tubing grade. Tubing L-80 has a burst rating of 7240 psi, a collapse rating of 10533.92 psi, and a tension rating of 107581.11 lbf. Tubing is rating will be the limit that determines the integrity of the well during the production period. Based on the evaluation result, L-80 production tubing that using Electrical Submersible Pump as an artificial lifting method is able to withstand the burst load, collapse load, tension load, and the erosional effect of the produced fluid. Therefore, the Electrical Submersible Pump in Well X as an artificial lift system can be carried out without changing the grade of the existing tubing production.
TUBING STRENGTH ANALYSIS AND FAILURE ASSESSMENT OF ELECTRICAL SUBMERSIBLE PUMP (ESP) WELL: A CASE STUDY ON PRODUCTION WELL “X” Brian Tony; Steven Chandra
Jurnal Mineral, Energi dan Lingkungan Vol 6, No 2 (2022): Desember
Publisher : Fakultas Teknologi Mineral, Universitas Pembangunan Nasional (UPN)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jmel.v6i2.7701

Abstract

This study will discuss the evaluation of tubing strength in Well X that using Electrical Submersible Pump as an artificial lifting method. The evaluation will be carried out to determine the risk of failure of production tubing due to erosional damage and the failure due to loads on tubing during production operation using Electrical Submersible Pump. Burst, collapse, and tension loads will be the main focus in evaluating the tubing load by considering the worst conditions that may be experienced during production operation. The calculation of the tubing load is done using Microsoft Excel. The result of tubing load calculation will be compared with the tubing rating based on tubing grade. Erosional damage prediction is carried out using software to determine the erosional velocity on the production tubing.This study will evaluate the production tubing used in Well X with an outer diameter of 3.5 inch and L-80 tubing grade. Tubing L-80 has a burst rating of 7240 psi, a collapse rating of 10533.92 psi, and a tension rating of 107581.11 lbf. Tubing is rating will be the limit that determines the integrity of the well during the production period. Based on the evaluation result, L-80 production tubing that using Electrical Submersible Pump as an artificial lifting method is able to withstand the burst load, collapse load, tension load, and the erosional effect of the produced fluid. Therefore, the Electrical Submersible Pump in Well X as an artificial lift system can be carried out without changing the grade of the existing tubing production.
Integrated Production Optimization of Mature Field Y Under Network Constraints Steven Chandra; Brian Tony; Rahma Widyastuti
Journal of Petroleum and Geothermal Technology Vol 4, No 2 (2023): November
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v4i2.10986

Abstract

The Y Field, a mature field experiencing declining reservoir pressure, the production of hydrocarbons is declining, leading to the need for production optimization. One crucial aspect of this optimization is the selection of suitable artificial lift methods. The choice of artificial lift methods in Field Y is dependent on the unique reservoir conditions of each well. The commonly utilized equipment for artificial lift methods in Field Y includes the Sucker Rod Pump (SRP) and the Electrical Submersible Pump (ESP).This bachelor thesis aims to develop an integrated production optimization strategy for maximizing well production in Structure X, a mature field. The study involves analyzing and optimizing artificial lift methods and integrating surface network simulation. The Inflow Performance Rate (IPR) curve is utilized to identify the production potential of each well in Structure X.By evaluating the pump performance and surface network in Structure X, it is possible to identify wells that utilize artificial lift or existing pumps and have the potential to be improved up to their maximum operating range, based on their gross flow rate (BFPD). Through optimization, adjusting the stroke per minute for the Sucker Rod Pump (SRP) and the operating frequency for the Electrical Submersible Pump (ESP) can lead to a significant increase in production. Specifically, with a design production rate of 2308.59 BFPD, an improvement of 82.23 BOPD can be achieved.