PERAN PERPIPAAN AIR LIMBAH DOMESTIK (STUDI KASUS DI DESA KEBON AYU) YOHANES MARDIANTO MAWAN METE; BAGUS WIDHI DHARMA S.; BAIQ RENI SARI DEWI
SOSIAL SAINS DAN TEKNOLOGI Vol 3, No 1 (2023): Mei 2023
Publisher : LPPM PSDKU Kampus Mataram UNMAS Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/sosintek.v3i1.424

Abstract

Pipeline networks and wastewater treatment processes can be optimized by planning with careful calculations in accordance with technical provisions regarding the flow of wastewater in pipes so that sediment and blockages do not occur. The purpose of this study was to determine the debit of household or domestic wastewater, the diameter of the wastewater pipes, and the effective piping system. This study uses a quantitative descriptive method. The data needed include topographical data, population, average water consumption, location map, and field elevation. The results showed that the discharge of wastewater in the village of Kebon Ayu had a population of 0.00189 m3/s with a population of 1685 people. With a minimum channel slope of 0.1%. The maximum diameter of the wastewater pipe for a discharge of 0.00189 m3/sec is 7.03 inches and the minimum diameter for a wastewater discharge of 0.00015 m3/sec is 2.99 inches. Waste water in the village of Kebon Ayu residents is channeled by piping using a branched pipe network system.
ANALISIS ANGGARAN BIAYA DAN REALISASI BIAYA PROYEK PEMBANGUNAN GEDUNG ASRAMA PUTRI DI YAYASAN DHARMA LAKSANA KOTA MATARAM I WAYAN GRYA DHANENDRA; BAGUS WIDHI DHARMA S.; I GUSTI NGURAH OCTAVA S.
SOSIAL SAINS DAN TEKNOLOGI Vol 3, No 2 (2023): November 2023
Publisher : LPPM PSDKU Kampus Mataram UNMAS Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/sosintek.v3i2.601

Abstract

This study aims to analyze the budget and realization of project costs for the construction of a female dormitory building at the Dharma Laksana Foundation, Mataram City. The method in this study uses a type of comparative descriptive method with a quantitative approach. The type of data used is quantitative data, the data sources used are primary data and secondary data.The total budget for the construction of the girls' dormitory building at the dharma laksana foundation is Rp. 435,130,197, and when the construction was carried out there were material changes which caused a difference in the budget of Rp. 512,726 where this difference was a profit, but there was some additional work outside the construction of this girls' dormitory building where the extra budget was included in additional work