p-Index From 2021 - 2026
0.659
P-Index
This Author published in this journals
All Journal HTJ
Aria Hansen
Jurusan/Program Studi Teknik Sipil, Fakultas Teknik, Universitas Kristen Palangka Raya

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

PERENCANAAN LAMPU LALU LINTAS (TRAFIC LIGHT) PADA SIMPANG EMPAT JALAN RAJAWALI – JALAN BADAK PALANGKA RAYA (Planning Of Traffic Lights (Trafic Light) On Four Junctions Of Rajawali Road - Jalan Badak Cross Circle) Aria Hansen
Huma Tabalien Jurnal (HTJ) Teknik Sipil Vol 1, No 1 (2021): HTJ Februari 2021
Publisher : Fakultas Teknik Universitas Kristen Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Palangka Raya is a city that is developing and has the potential for population density, besides that it has the potential in the fields of education and government so that it attracts people from outside the region to come to the city. This will have an impact on traffic flow, especially on roads that have intersections. Especially at the intersection on the road Rajawali - Badak, a traffic light plan was held to be used as a final project research. Installation of traffic lights on intersection roads serves to facilitate orderly and safe traffic movement so as to increase road capacity at intersections, reduce the frequency of various types of accidents and cut off high traffic flows to allow for the spread of vehicles or pedestrians. To plan the traffic lights we use calculations with the Webster method. The calculations performed only determine the cycle time. The results obtained from the traffic light planning at the intersection of the Rajawali - Badak road are that the cycle times are obtained faster so that the queue of vehicles that stop at the intersection is not too long and does not cause congestion. Keywords: Traffic Lights, Webster Method, Cycle Time, Queues and Congestion.
EVALUASI TINGKAT KERUSAKAN JALAN SEBAGAI DASAR PENENTUAN PERBAIKAN JALAN PADA RUAS JALAN SOEKARNO HATTA KOTA KASONGAN (Evaluation Of Road Damage As A Basis For Determining Road Improvements On Soekarno Hatta Road, Kasongan City) Aria Hansen; Ibot Satriady
Huma Tabalien Jurnal (HTJ) Teknik Sipil Vol 3, No 1: HTJ Februari 2023
Publisher : Fakultas Teknik Universitas Kristen Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to identify road pavement damage. Identification of road damage includes the type of damage and the level of road damage so that the road pavement condition value and alternatives for handling the road damage can be identified. The research location was carried out on the Seokarno Hatta road section, Kasongan city Keywords: Implementation Methods / Terms of Reference, Resources
PERENCANAAN TARIF ANGKUTAN UMUM JURUSAN PALANGKA RAYA – TUMBANG HIRAN DALAM MASA PANDEMI ( COVID-19 ) Aria Hansen; Robot ,
Huma Tabalien Jurnal (HTJ) Teknik Sipil Vol 2, No 1 (2022): Vol 2, No 1 (2021): HTJ Februari 2022
Publisher : Fakultas Teknik Universitas Kristen Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

: The public force is a means of transportation needed by most urban/regional people, it is impossible for a city/region to live without public transportation. Taxi public transportation is one of the alternative public transportation in the district area, which provides other services and is not the same as other transportation. The purpose of this study is to determine the amount of Vehicle Operating Costs (BOK) for public transportation from Palangka Raya City to Tumbang Hiran Village, as well as to find out the amount of passenger fares in accordance with the Vehicle Operational Costs (BOK) issued. Based on the results of the analysis of Vehicle Operational Costs (BOK), the total basic costs per day for general passengers for the City of Palangka Raya Towards Tumbang Hiran Village are: Innova cars of Rp. Hiran is Rp. 150,305.28/person/trip. The basic fare for public transportation heading from Palangka Raya City to Tumbang Hiran Village is IDR 165,335.66/org/rit. While the tariff at the time this research was conducted was Rp. 350,000 total revenue per day at a rate of Rp. 350,000 x the number of trips per day was Rp. 1,400,000 / person / person. The two transportation vehicles above provide a decent opinion for the manager / owner For passengers, the price is reasonable, feasible and affordable because it is in accordance with the time and distance traveled. Keywords: Public Transportation / Taxi, Vehicle Operational Cost (BOK) per km, Total cost