Evaluation of Time Management in the 6-Storey Polyclinic Building Project of QIM Batang Hospital Using the CPM Method Jamal, Jamal; Nisa, Fitri Khoirun; Prasetyo, Rendy
Portal: Jurnal Teknik Sipil Vol 17, No 1 (2025): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v17i1.8241

Abstract

Project time management is the process of planning, organizing and controlling the schedule of project activities. Time management is needed in a project implementation so that the project can run exactly according to the predetermined time. Scheduling is part of controlling time management. Along with the development of technology and science, project scheduling methods are also developing. One of the scheduling methods that is often used is the Critical Path Method, which is a technique of analyzing the activity network to predict the total duration. This research focuses on evaluating time management on the Batang QIM Hospital Polyclinic Building Project with the CPM method to find out the work that crosses the critical path. In the implementation of the Batang QIM Hospital Polyclinic project, several obstacles were encountered which resulted in the delay of work causing the project to be late. These obstacles include labor, materials, and weather. From the analysis that has been done based on the schedule plan that has been made before there are 7 types of work that cross the critical path. The total project duration required after using the CPM method is 43 weeks or one week earlier than the planned schedule of 44 weeks.
Concrete Quality Control on Rigid Pavement in The Petamanan - Sidomulyo Road Rehabilitation Project Limpung Sub-District Batang District Jamal, Jamal; Rizal, Zahrul; Ian, M. Rezki; Prasetyo, Rendy
Portal: Jurnal Teknik Sipil Vol 17, No 1 (2025): April Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v17i1.8242

Abstract

The implementation of rigid pavement construction, in fact, has concrete quality results that do not meet the applicable criteria or specifications so that concrete work on rigid pavement can experience cracks or concrete fractures. The research was conducted by direct observation in the field and collecting laboratory testing data, then analyzing by comparing the results of concrete work against the Indonesian National Standard (SNI) and the acceptance of concrete quality based on the 2018 Bina Marga General Specifications (Revision 2) on the Petamanan - Sidomulyo Road Rehabilitation project, Limpung District, Batang Regency. The results showed that the Job Mix Formula (JMF) used in the field produced slump values that met the criteria. The level of uniformity of the quality of concrete implementation on the results of the bending strength of the beam shows the value of the standard deviation with the classification of "excellent" and the level of variation is included in the classification of "very good". The conclusion from the calculation shows that the flexural strength of the beam samples during implementation at each station meets the specification fs'45 kg/cm2 (4.41Mpa) at the age of 28 days.
EXPOSURE TIME AND MONITOR DISTANCE WITH EYE FATIGUE IN EMPLOYEES OF THE REGIONAL OFFICE OF LABOR BPJS SUMBAGUT MEDAN Husna, Jihaan Hazrati; Salwa, Jihan Maishie; Rifdha, Aliyah; Sinaga, Nur Elviyani; Prasetyo, Rendy; Permata, Marcella; Utami, Tri Niswati
HEARTY Vol 13 No 6 (2025): DESEMBER
Publisher : Fakultas Ilmu Kesehatan, Universitas Ibn Khaldun, Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/hearty.v13i6.18777

Abstract

Workers who use computers in daily activities often experience eye fatigue. Visual disorders caused by computer use can include various complaints, such as: blurred vision, unclear images, double vision, difficulty distinguishing colors, red eyes, eyes that are often sore, frequently itchy, often feeling tense, eyes that easily become sleepy, reduced accommodation ability, and headache symptoms. This research uses qualitative research as a complex description, by studying words, obtaining detailed reports from respondents' perspectives, and investigating experienced situations. The purpose of this research is to determine the relationship between long exposure and monitor distance with employee eye fatigue at the BPJS Ketenagakerjaan Sumbagut Regional Office. Employees working with an 8-hour system per day for 5 working days rarely apply the 20-20-20 method recommended by the Ministry of Health to prevent eye fatigue.
Pengaruh Biaya terhadap Penyebab Keterlambatan Penyelesaian Proyek Konstruksi Gedung Jamal, Jamal; Prasetyo, Rendy; Ghassani, Dewi Bussaina
Portal: Jurnal Teknik Sipil Vol 17, No 2 (2025): October Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v17i2.8786

Abstract

Keterlambatan penyelesaian proyek konstruksi gedung merupakan masalah yang umum terjadi dan berdampak signifikan pada biaya serta kualitas proyek. Penelitian ini bertujuan untuk menganalisis pengaruh biaya terhadap penyebab keterlambatan proyek konstruksi gedung. Metode penelitian yang digunakan adalah survei terhadap proyek gedung di Indonesia dengan teknik pengumpulan data melalui kuesioner dan wawancara dengan manajer proyek, kontraktor, dan tenaga teknis. Data dianalisis menggunakan regresi linier untuk mengetahui hubungan antara variabel biaya (cost performance, cost overrun, estimasi biaya) dengan variabel keterlambatan (time overrun). Hasil penelitian menunjukkan bahwa pengelolaan biaya yang tidak tepat, keterlambatan pembayaran, dan perubahan desain berpengaruh signifikan terhadap keterlambatan proyek. Temuan ini diharapkan dapat menjadi dasar perbaikan strategi manajemen biaya untuk meminimalkan keterlambatan proyek di masa mendatang.
Penyusunan / Analisis Perencanaan Rencana Anggaran Biaya (Rab) Gedung Pos Kesehatan Desa (PKD) Desa Limbangan (Studi Kasus Di Desa Limbangan Kecamatan Limbangan Kabupaten Kendal) tyo, pras; Prasetyono, Tri; Prasetyo, Rendy; Dwiyana Putra, Ryan; Aisya Fitri, Amanda
JERA : Journal of Engineering Research and Application Vol 5 No 1 (2026): JERA : Journal of Engineering Research and Application
Publisher : Fakultas Teknik dan Rekayasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51792/8exdp152

Abstract

Proyek pembangunan gedung Pos Kesehatan Desa (PKD) ini merupakan salah satu proyek konstruksi yang dilaksanakan dengan menggunan anggaran Dana Desa, dimana sebelum pelaksanaan kegiatan tersebut harus masuk dalam dokumen Rencana Kerja Pemerintah Desa (RKPDesa) dan Anggaran Belanja Desa (APBDesa). Penelitian ini menggunakan metode kuantitatif dengan perhitungan analisa harga satuan pekerjaan yang didapat dari Dinas Pekerjaan Umum dan Penataan Ruang (DPUPR) Kabupaten Kendal dan data utama dari Anggaran Belanja Desa (APBDesa) Desa Limbangan Tahun 2025. Hasil dari penelitian ini diperoleh Rencana Anggaran Biaya (RAB) untuk pembangunan Gedung Pos Kesehatan Desa (PKD) Desa Limbangan Kabupaten Kendal sebesar Rp. 778.500.000,00 (Tujuh ratus tujuh puluh delapan juta lima ratus ribu rupiah).