Luthfan Noor Irsyad Listyatama
Fakultas Ilmu Komputer, Universitas Brawijaya

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis dan Perancangan Desain Sistem Informasi Manajemen Proyek (Studi Kasus: Dinas Perumahan Kota Pasuruan) Luthfan Noor Irsyad Listyatama; Widhy Hayuhardhika Nugraha Putra; Admaja Dwi Herlambang
Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer Vol 5 No 6 (2021): Juni 2021
Publisher : Fakultas Ilmu Komputer (FILKOM), Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In every project management company is needed in planning and project management to achieve company goals. Such as the Pasuruan City Government at the Housing Service in the community housing division in managing projects in the construction sector. However, project planning and management is handled manually so that it is not efficient and effective in managing the project, such as difficult to control the project from the timeline and progress side, it is difficult to see the progress of the S curve regularly, too much effort for periodic project control processes and compiling final reports, reports still manual, and data is not integrated. Therefore, the Pasuruan City Housing Office asked a Profile Image Studio (PIS) to build a project management information system in the construction sector. In designing this information system using the Object Oriented Analysis and Design (OOAD) method. At the design stage using UML diagrams to model and provide a detailed description of the system requirements to be made. The results of the analysis and system design will be evaluated using the traceability method, usability testing and prototype testing. From the results of the needs analysis resulted in 24 features consisting of 21 functional requirements and 3 non-functional requirements, 3 actors and 8 use cases. In the evaluation using the traceability method with a matrix, all needs can be identified and are appropriate. In prototype testing, all use cases are in accordance with what the system user needs. The usability method produces an average success rate of 94%, while the time based efficiency produces an average value of 0.2 task / second.