Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kualitas Produk dan Harga Motor Beat terhadap Keputusan Pembelian Konsumen Dealer Honda Muara Bulian (Studi Kasus Masyarakat Perumnas Muara Bulian) Damanik, Eva Setia Rini; Ningsih, Yulia Istia
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 2 (2024): Juli
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i2.5285

Abstract

This study will describe respondent responses to product quality, price, and purchasing decisions. This study is quantitative research, using a questionnaire given to the sample. This research was conducted at a Honda dealer at the Muara Bulian National Housing community who bought the BEAT motorcycle in 2022. In Research, researchers took a sample of 66 people. Population in research entire society who bought a Motor Beat in 2022. The results of this research showed that the Muara Bulian National Housing Society stated good of the quality of the Motor Beat product. Society considered that the price of the Motor Beat Beingwas in the affordable category, and society considered that purchasing decision a Beat motorbike was appropriate, and product quality and price influenced the decision to purchase a Beat motorbike by 77.0%
Pengaruh Beban Kerja terhadap Kinerja Panitia Pemungutan Suara (PPS) Pemilu 2024 Sekecamatan Bajubang Kabupaten Batang Hari Darma, Budi; Wulansari, Kasiyati Yunita; Damanik, Eva Setia Rini; Ningsih, Yulia Istia; Fauziah, Fauziah
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i1.5041

Abstract

This research examines the influence of workload on the performance of the Polling Station Committee (PPS) for the 2024 Election in the Bajubang Subdistrict, Batang Hari Regency. The research sample consists of 30 individuals. The analytical tools used include simple linear regression, t-test, and coefficient of determination. In the t-test results, the workload variable significantly influences the performance of the Polling Station Committee (PPS) for the 2024 Election in the Bajubang Subdistrict, Batang Hari, individually (partial). In the Coefficient of Determination test, the workload variable affects the performance of the Polling Station Committee (PPS) for the 2024 Election in the Bajubang Subdistrict, Batang Hari, by 36.6%. Meanwhile, 63.4% of the performance of the Polling Station Committee (PPS) for the 2024 Election in the Bajubang Subdistrict, Batang Hari, is influenced by other variables not examined in this study.