This Author published in this journals
All Journal Metalurgi
Puguh Prasetiyo
Pusat Penelitian Metalurgi - LIPI

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

MASIH TERBUKANYA PELUANG PENELITIAN PROSES CARON UNTUK MENGOLAH LATERIT KADAR RENDAH DI INDONESIA Puguh Prasetiyo
Metalurgi Vol 26, No 1 (2011): Metalurgi Vol. 26 No. 1 April 2011
Publisher : National Research and Innovation Agency (BRIN)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (222.96 KB) | DOI: 10.14203/metalurgi.v26i1.7

Abstract

Indonesia memiliki cadangan nikel pada peringkat dua dunia. Cadangan tersebut berupa bijih nikel oksida yang  lazim disebut  laterit, berada di Kawasan Timur Indonesia (KTI) terutama di Sulawesi Tenggara dan Halmahera. Adapun laterit terdiri dari limonit berkadar Ni<1,5 % dan saprolit berkadar Ni>1,5 %. Laterit kadar tinggi saprolit berkadar   Ni>1,8 % sudah diolah di Sulawesi Tenggara dengan jalur pyrometalurgi oleh PT Antam (Aneka Tambang) untuk memproduksi FeNi (ferro nikel) di Pomalaa, dan PT INCO Canada untuk memproduksi nikel mattte (Ni-matte) di Soroako. Laterit kadar rendah yang terdiri dari limonit dan saprolit dengan kandungan Ni<1,8 %, belum diolah di dalam negeri. Secara komersial untuk mengolah laterit kadar rendah digunakan proses Caron yang pertama kali dibangun di Nicaro Cuba oleh Freeport USA pada tahun 1942. Atau proses HPAL (High Pressure Acid Leaching) juga pertama kali dibangun di Moa Bay Cuba oleh Freeport USA pada tahun 1959. Kedua proses tersebut tergolong dalam jalur hydrometalurgi, dan pemilihan proses tergantung  dari  kondisi  bijih  terutama  pada  kandungan  Mg  (magnesium).  Laterit  kadar  rendah  dengan kandungan Mg (magnesium) rendah (Mg < 6 % atau MgO < 10 %) lebih sesuai untuk diolah dengan proses HPAL, dan magnesium tinggi (Mg > 6 % atau MgO > 10 %) diolah dengan proses Caron. Dalam perkembangannya setelah tahun 1990-an, proses Caron mulai ditinggalkan karena mengkonsumsi energi tinggi dengan perolehan yang rendah untuk nikel (Ni : 70 – 80 %) maupun kobal (Co maks 50 %). Selanjutnya beralih ke proses HPAL karena proses ini mengkonsumsi energi rendah dengan perolehan tinggi untuk nikel (Ni > 90%) maupun kobal (Co > 90 %). Dengan melihat kenyataan kegagalan tiga HPAL plant generasi kedua di Australia (Bulong tutup 2003, Cawse tutup 2008, dan Murrin Murrin berpindah kepemilikan ke Minara pada 2003/2004 dan beralih ke heap leach tahun 2007). Serta masih berlangsungnya Caron plant di Cuba (Nicaro dan Punta Gorda), Queensland Nickel di Yabulu Australia, dan Tocantin Brasilia. Maka proses Caron masih punya peluang untuk mengolah laterit kadar rendah di Indonesia. Peluang tersebut semakin terbuka apabila perolehan metal (recovery Ni dan Co) pada proses Caron bisa ditingkatkan setara dengan perolehan metal (recovery Ni dan Co) pada proses HPAL, dan ekonomis konsumsi energinya. AbstractIndonesia had the resources of nickel at the second in the world. The resources are nickel oxide which said laterite. The abundant of laterite locate at Sulawesi Tenggara (South-East Sulawesi) and Halmahera. There are two main mineral in laterite, limonit contains Ni<1,5% and saprolit contains Ni>1,5%. The high grade nickel saprolit contains Ni>1,8% has been processed in Sulawesi Tenggara to produce FeNi (ferro nickel) in Pomalaa by PT Antam, and to produce Ni-matte (nickel matte) in Sorowako by PT INCO Canada. The low grade laterite (limonit and saprolit contains Ni<1,8%) not yet processed in Indonesia. To process the low grade laterite are used Caron’s process or HPAL’s process (High Pressure Acid Leaching). The condition of laterite’s ores are used to choice the process. The Caron’s process is remained after 1990’s because it consume high energy with low metal recovery (Ni : 70 – 80 % Co max 50 %). The choice to process low gradelaterite is HPAL because it consume low energy wiyh high recovery of metal (Ni > 90 % and Co > 90 %). The fact three HPAL plant in Australia unsuccessful (Bulong closed on 2003, Cawse closed on 2008, and Murrin Murrin taked over by Minara and change to heap leach on 2007) and the Caron plant still exist in Cuba (Nicaro and Punta Gorda), Queensland Nickel di Australia, and Tocantin Brasilia. Then Caron’s process still have opportunity to process the low grade laterite in Indonesia if the recovery of metal can be increase as same as HPAL and the consume of energy can be decreased.
PELUANG PENELITIAN UNTUK MEMPERBAIKI TEKNOLOGI PROSES UNTUK MENGOLAH BIJIH NIKEL LATERIT KADAR RENDAH INDONESIA[ Puguh Prasetiyo
Metalurgi Vol 26, No 2 (2011): Metalurgi Vol.26 No.2 Agustus 2011
Publisher : National Research and Innovation Agency (BRIN)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (215.181 KB) | DOI: 10.14203/metalurgi.v26i2.12

Abstract

Indonesia kaya dengan SDA (Sumber Daya alam) bijih  nikel oksida yang  lazim disebut  laterit. Laterit berkadar nikel tinggi saprolit (Ni>1,8%) sudah diolah dengan jalur proses pirometalurgi di Sulawesi Tenggara untuk memproduksi ferro nikel (FeNi) oleh PT Aneka Tambang di Pomalaa, atau untuk memproduksi Ni-matte oleh Vale INCO di Soroako. Laterit berkadar nikel rendah yang terdiri dari limonit dan saprolit dengan Ni<1,8 %, belum diolah di tanah air. Untuk  mengolahnya digunakan proses Caron atau proses HPAL/PAL (HighPressure Acid Leaching). Dimana kedua proses tersebut termasuk jalur proses hidrometalurgi. Pemerintah telah memberi ijin kepada pihak asing untuk mengolah laterit kadar rendah pulau Gag Papua dengan proses Caron pada PT Pasific Nickel USA pada tahun 1967 (menjelang awal Orde Baru). Akibat harga minyak dunia yang naik secara dramatis setelah 1973, maka PT Pasific Nickel membatalkan rencananya dan mengembalikan ijin ke pemerintah. Ijin juga diberikan pada dua PMA (Penanaman Modal Asing) pada Januari 1998 (menjelang akhir Orde Baru) untuk mengolah laterit kadar rendah dengan proses HPAL/PAL, yaitu PT BHP Australia untuk mengo lah laterit pulau Gag Papua, dan PT Weda Bay Nickel (WBN) Canada untuk mengo lah laterit teluk Weda Halmahera.  Dalam perjalanan waktu PT WBN Canada dimiliki Eramet Perancis sejak Mei 2006, dan sampai saat ini (2011) tidak ada kepastian kapan PT WBN Eramet Perancis merealisasikan proyeknya. Sedangkan PT BHP Australia mengembalikan ijin pulau Gag ke pemerintah pada awal tahun 2009. Kenyataan mundurnya tiga (3) PMA dari Indonesia untuk mengo lah laterit kadar rendah dengan jalur proses hidrometalurgi. Bisa menjadi peluang bagi pemerintah untuk menguasai sebagian teknologi yang akan digunakan oleh pihak asing untuk mengolah  laterit  kadar  rendah.  Penguasaan  teknologi tersebut  diperoleh  dari aktifitas  penelitian,  dan  hasil penelitian dipatenkan. Dengan demikian diharapkan pemerintah bisa punya posisi tawar untuk meningkatkan kepemilikan saham dengan pihak asing. Apabila di kemudian hari ada pihak asing yang berminat mengolah laterit pulau Gag Papua dan wilayah lain di Kawasan Timur Indonesia. Atas dasar penjelasan diatas maka dibuat tulisan ini AbstractThe low grade laterite (limonite and saprolite with Ni < 1.8 %) has not yet processed in Indonesia. It uses process hydrometallurgy. The government of Indonesia has been give permission to foreign company to process the low grade laterite with hydrometallurgy (Caron process and HPAL process). Process Caron is used to process laterite Gag island Papua for PT Pasific Nickel USA on 1967. The dramatical increase price of fuel oil after 1973, it become PT Pasific Nickel give up plan and it give back the permission to the government. Process HPAL (High Pressure Acid Leaching) are used to process laterite teluk Weda (Weda Bay) Halmahera for PT Weda Bay Nickel (WBN) Canada and Gag island Papua for BHP Australia. Two companies got the permission on last new era on January 1998. The permission of Gag island Papua is returned by BHP Australia on first year 2009 and the uncertainity when PT WBN Eramet France (PT WBN Canada takes over by Eramet on May 2006) to build HPAL plant. It becomes opportunity to control the part of technology to process the low laterite via research. So the government has bargaining position to increase share at foreign company.