Analysis of Occupational Safety and Health Management System (SMK3) on Workers In Cikeruh Majalengka Bridge Construction Project Pachri Sutanto; Renata Pitaloka; Lia Fatmala; Nikko Rozy
Devotion : Journal of Research and Community Service Vol. 6 No. 1 (2025): Devotion: Journal of Community Research
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/devotion.v6i1.25411

Abstract

The implementation of safety and health (OSH) systems in the work environment is a crucial component for the running of a business entity, because the consequences of accidents can have a detrimental impact on the workforce and the institution. This study was conducted to evaluate how OHS affects the level of worker productivity. A quantitative approach is the method used by collecting primary data through distributing questionnaires to 35 workers at the Cikeruh Majalengka Bridge Construction Project. Data analysis was carried out using IBM SPSS 26.0 for Windows, by conducting an Instrument Test consisting of Validity Test and Reliability Test. The variables studied consisted of four independent variables: Planning (X1), Organization (X2), Actuating (X3), Controlling (X4) and one dependent variable, namely Worker Productivity (Y). The results showed that Planning has a positive effect on productivity with an average value of 1.98, Organization 2.0, Actuating 1.78, and Controlling 1.94. The four independent variables as a whole have an average value of 1.92 which indicates a positive influence on worker productivity on the project, because it is in the interval class 1.6 ≥ x ≤ 2.0. This proves that factors such as planning, organization, implementation, and supervision play a significant role in increasing worker productivity on the Majalengka Cikeruh Bridge Construction Project.
Analisis Geometrik Jalan Ruas Jalan Lingkar Utara Majalengka Kabupaten Majalengka Siti Masitoh; Nikko Rozy; Saihul Anwar
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 8 No 1 (2019): JURNAL KONSTRUKSI (JANUARI 2019)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v8i1.3758

Abstract

ABSTRAKUntuk memperlancar pergerakan manusia dari tempat asal ketempat tujuan harus terpenuhi sarana transportasi yang memadai baik darat, laut mapun udara. Umunya darat lebih mendominasi untuk menunjang kegitan itu seperti halnya jalan raya, rel kereta merupakan salah satu di dalamnya.Keadaan yang baik untuk itu ada di jalan raya yang lebih sering dijumpai dalam pergerakan orang dari tempat asal ketempat tujuan  (untuk jarak yang relative pendek), jalan raya suatu saat tidak dapat menampung volume kendaraan yang setiap hari menggunakannya oleh sebab itu pencarian solusi tentang hal inisangat perlu dikembangkan baik dari penambahan ruas maupun perencanaan jalan baru (dalam hal ini mengatasi keterbatasan volume kendaraan yang menggunakannya dengan kata lain macet).Adanya skripsi ini untuk menganalisa kondisi alinyemen vertical dan alinyemen horizontal pada ruas jalan Lingkar Utara Majalengka (Panyingkiran-Baribis) yang tepatnya pada titik koordinat X = 189856 ; Y = 9245977 (Panyingkiran) dan berakhir pada titik koordinat X = 195737 ; Y = 9246251 (Baribis), yang pada saat sekarang ini kurang merasa nyaman dikarenakan kurangnya superelevasi pada jalan tersebut.Kata kunci :Transportasi, Kemacetan, Volume Kendaraan.ABSTRACTTo facilitate the movement of humans from the place of origin to the destination must be fulfilled adequate transportation facilities both land, sea and air. Generally land dominates to support the activity as well as highways, railroads are one of them.The situation is good for that on the highway which is more often found in the movement of people from their original place of destination (for relatively short distances), the highway at one time can not accommodate the volume of vehicles that use it every day because of this it needs to be developed both from adding sections and planning new roads (in this case overcoming the limitations of the volume of vehicles that use it in other words jams).The existence of this thesis is to analyze the condition of vertical alignment and horizontal alignment on the Majalengka (Panyingkiran-Baribis) North Ring road section which is precisely at the coordinate point X = 189856; Y = 9245977 (Panyingkiran) and ends at the coordinate point X = 195737; Y = 9246251 (Baribis), which at the moment is not comfortable due to the lack of superelevation on the road.Keywords: Transportation, Congestion, Vehicle Volume.
ANALISIS PENINGKATAN JALAN PADA RUAS JALAN SITANGGAL – SLAWI Agus Gunawan; Saihul Anwar; Nikko Rozy
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 5 No 6 (2016): JURNAL KONSTRUKSI (AGUSTUS 2016)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v5i6.3820

Abstract

ABSTRAKRuas jalan Sitanggal – Slawi merupakan prasarana transportasi, merupakan jalur alternatif Kabupaten Brebes menuju Kabupaten Slawi dan sebaliknya, saat ini kondisi ruas jalan ini memiliki Lebar 6 m dilihat dari kondisi fisiknya jalan ini tidak mencerminkan statusnya yang merupakan jalan provinsi. Tujuan dari penelitian ini adalah untuk mendapatkan gambaran peningkatan yang terjadi, untuk meningkatkan volume lalu lintas di ruas jalan tersebut dan besarnya persentase kendaraan yang melintas pada ruas jalan Sitanggal – Slawi.Daerah jalan Sitanggal – Slawi ini memiliki kapasitas jalan sebesar 2454 smp/jam dengan derajat kejenuhannya 0.31 yang termasuk kedalam tingkat pelayanan C. Ruas jalan Sitanggal – Slawi ini memiliki kapasitas jalan pada tahun 2023,didapat volume lalu lintas sebesar 1844  dan derajat kejenuhannya 0,75,sehingga perlu dilakukan pelebaran jalan menjadi 7 m. Daerah ruas jalan Sitanggal – Slawi memiliki intensitas curah hujan yang cukup tinggi, yaitu berkisar antara 1000 – 5000 mm/tahun. Daerah ini berada di kelandaian jalan 10% dan memiliki persentase kendaraan sebesar  30%.            Setelah melakukan analisis dan perhitungan pelebaran diketahui tebal lapisan tambahan pada ruas jalan Sitanggal – Slawi adalah 12 cm dengan jenis aspal Laston 590.Kata Kunci : Volume Lalu Lintas, Lapisan Tambahan, Pelebaran Jalan ABSTRACT            Road section Sitanggal - Slawi was a means of transportation, an alternative route towards Brebes Regency Slawi and vice versa , the current condition of this road has a width of 6 m seen from his physical condition does not reflect the status of this road which is a provincial road .The purpose of this research is to gain an increase occurs , to increase the volume of traffic on these roads and the percentage of passing vehicles on the road Sitanggal - Slawi .            Street area Sitanggal - Slawi has the capacity of 2454 smp / hour with a degree of saturation 0:31 are included in the service level C.Road section Sitanggal - Slawi have a capacity road in 2023 , obtained the volume of traffic by 1844 and the degree of saturation of 0.75 , so it is necessary to widen the road to 7 m .Regional roads Sitanggal - Slawi has the intensity of rainfall is quite high , ranging between 1000 - 5000 mm / year . This area is in the flatness of the 10 % and the percentage of vehicles by 30 % .After analysis and calculation deketahui widening thick extra layer on roads Sitanggal - Slawi is 12 cm with the type of asphalt Laston 590 .Keywords : Volume Traffic, Layer Supplement, Widening Road.
ANALISIS PENINGKATAN PADA RUAS JALAN KERSANA – BANJARHARJO KABUPATEN BREBES Salman Alparis; Saihul Anwar; Nikko Rozy
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 6 No 1 (2017): JURNAL KONSTRUKSI (JANUARI 2017)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v6i1.3823

Abstract

ABSTRAKRuas jalan Kersana – Banjarharjo yang  menghubungkan Kec. Kersana dan Kec. Banjarharjo Kab. Brebes Jawa Tengah ini memiliki kondisi jalan yang kecil dan pada kondisi existing  ruas jalan ini mengalami kerusakan yang cukup parah. Panjang ruas jalan yang akan dilakukan analisis 6.3 KM dilihat dari  kondisi fisiknya jalan ini tidak mencerminkan statusnya yang merupakan jalan  provinsi.Tujuan penelitian ini adalah  untuk mendapatkan gambar peningkatan yang terjadi, untuk meningkatkan volume lalu lintas pada ruas jalan tersebut dan besarnya presentase kendaraan yang melintasi ruas jalan Kersana -  Banjarharjo.Daerah ruas Kersana – Banjarharjo ini memiliki kapasitas jalan sebesar 1884 smp/jam dengan derajat kejenuhan 0,32 yang termasuk pada tingkat pelayanan B. Daerah ruas jalan Kersana – Banjarharjo ini memiliki volume kapasitas jalan pada tahun 2026 memiliki volume lalu lintas sebesar 2940 dan derajat kejenuhan 0,64 dan pelebaran jalan menjadi 7 m.Setelah melakukan analisis dan perhitungan diketahui tebal lapisan tambahan pada ruas jalan Kersana – Banjarharjo adalah 13 cm dengan jenis aspal Laston 590.Kata Kunci : Transportasi, Komponen Kendaraan, dan Geometrik jalan.ABSTRACTKersana–Banjarharjo road which connects the Kec. Kersana and Kec. Banjarharjo Kab. Brebes, Central Java has a small road conditions and on the conditions of existing roads suffered substantial damage. The length of roads is going to do an analysis of 6.3 KM views of his physical condition this way does not reflect its status which is a provincial road.The purpose of this research is to get a picture of the increase that occurred, to increase the volume of traffic on the roads and the magnitude of the percentage of vehicles that cross roads Kersana-Banjarharjo.Kersana segment – Banjarharjo area has a capacity of 1884 road junior high school with a degree of saturation 0.32 which included on the level of service b. Kersana roads Area – Banjarharjo has a volume capacity of the road in the year 2026 has a traffic volume of 2940 and the degree of saturation 0.64 and road widening to 7 m.After doing the analysis  and calculation of the additional  layer  thickness  on  unknown  roads  Kersana  –  Banjarharjo  is 13 cm long with a type of asphalt Laston 590. Keywords: Transport, Vehicle Components, and Geometric Way.
ANALISIS MANAJEMEN KONSTRUKSI PROYEK JEMBATAN PAKUBEUREUM KECAMATAN KADIPATEN KABUPATEN MAJALENGKA Dikdik Nur Fahmi; Saihul Anwar; Nikko Rozy
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 6 No 6 (2017): JURNAL KONSTRUKSI (APRIL 2017)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v6i6.3875

Abstract

ABSTRAKJembatan adalah suatu konstruksi yang berfungsi untuk melewatkan lalu lintas yang terputus pada kedua ujungnya akibat adanya hambatan berupa: sungai/lintasan air, lembah, jalan/jalan kereta api yang menyilang dibawahnya. Struktur bawah jembatan adalah pondasi. Suatu sistem pondasi harus dihitung untuk menjamin keamanan, kestabilan bangunan diatasnya, tidak boleh terjadi penurunan sebagian atau seluruhnya melebihi batas-batas yang diinginkan.Penelitian ini dilakukan untuk mengetahui kinerja tenaga kerja dan peralatan yang digunakan pada pelaksanaan proyek, Kinerja Waktu dan Biaya akhir pelaksanaan proyek, spesifikasi bahan/material yang digunakan pada pelaksanaan proyek, mengetahui Metode Pelaksanaan pada proyek Jembatan Pakubeureum Kecamatan Kadipaten Kabupaten Majalengka.Hasil Penelitian menunjukkan bahwa Rencana Anggaran Biaya yang dikeluarkan untuk Pembangunan Jembatan Pakubeureum sebesar Rp. 4.461.762.521,66. Kemudian dengan menggunakan Analisa Critical Path Method Penyelesaian Pekerjaan membutuhkan waktu selama 20 minggu. Kata Kunci     : Manajemen Konstruksi, Volume, RAB, Barchart, Kurva S, dan Critical Path Method.  ABSTRACT          The bridge is a construction which acts to bypass the traffic is cut off at both ends due to barriers such as rivers/water passage, the valley, the road/railroad crossing underneath. Under the structure of the bridge is the foundation. A foundation system must be calculated to ensure the security, the stability of the building thereon, shall not be decreased partially or wholly beyond the boundaries desired.          His study was conducted to determine the performance of the labor and equipment used in the implementation of the project, Time and Cost Performance of projects, material specifications / material used in the implementation of the project, knowing Implementation Method on Bridge project Pakubeureum Duchy District of Majalengka.          Research results show that the Budget Plan issued for Bridge Construction Pakubeureum Rp.4.461.762.521,66. Then by using the Critical Path Method Analysis of Completion takes as long as 20 weeks.  Keyword         : Construction Management, Volume, RAB, Barchart, S Curve, and Critical Path Method.
ANALISIS MANAJEMEN KONSTRUKSI PEMBANGUNAN GEDUNG PK – PPK BANDAR UDARA INTERNASIONAL JAWA BARAT KERTAJATI , MAJALENGKA Opi Tresna Hamdani; Nikko Rozy
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 7 No 4 (2018): JURNAL KONSTRUKSI (APRIL 2018)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v7i4.3905

Abstract

"> ABSTRAKManajemen proyek merupakan proses terpadu dimana individu-individu sebagai bagian dariorganisasi dilibatkan untuk memelihara, mengembangkan, mengembalikan dan menjalankan programdengan menggunakan sumber daya terbatas secara efisien, efektif dan tepat waktu dalam menyelesaikansuatu proyek yang telaah direncanakan, yang kesemuanya diarahkan pada sasaran yang telah ditetapkandan berlangsung terus menerus seiring berjalanya waktu.Penelitian ini dilakukan untuk menganalisa Manajemen konstruksi perencanaan pembangunanGedung PK-PPK Mulai dari menghitung volume, Rencana anggaran biaya, Metode Barchart ,Kurva S, danMenganalisa Critical Path Method. Tujuan dicapai melalui studi Literatur, Pengumpulan data – data teknis,dan peninjauan data berupa gambar bestek.Hasil penelitian menunjukan bahwa Rencana Anggaran Biaya yang dikeluarkan untukpembangunan Gedung PK-PPK 3 Lantai sebesar Rp. 14.492.563.000 Kemudian dengan menggunakananalisa Critical Path Method Penyelesaian Pekerjaan membutuhkan waktu selama 17 minggu.Kata kunci : Manajemen Konstruksi, Volume, RAB, Barchart, Kurva S, Critical Path MethodABSTRACTProject Management is the process by which individuals are the integrated as part of anorganization involved to maintain, develop, control, and work the program by using limited resources inan efficient, effective, and timely in targets has esthabilished and continues over time.This study was conducted to analyze the Construction Management Development Planing OficeRanging from CalculatesVolume, Budget Plan, Barchart Method, S Curve and Crical Path MethodAnalysis. And reviewof data in the from building desain.Research shows that the Budget Plain issued for contruction of a 3th floor in the amount of RP.14.492.563.000 Then by using Critical Path Method Analysis Completicion Takes as long as 17 weeks.Keyword : Construction Management, Volume, RAB, Barchart, S Curve, Critical Path Method.
ANALISIS MANAJEMEN KONSTRUKSI PEMBANGUNAN GEDUNG RAWAT INAP KELAS III RSUD WALED KABUPATEN CIREBON Prianto Wibowo; Nikko Rozy
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 9 No 2 (2020): JURNAL KONSTRUKSI (APRIL 2020)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v9i2.3928

Abstract

ABSTRAK Manajemen proyek adalah proses penerapan fungsi-fungsi manajemen (perencanaan, pelaksanaan, pengendalian dan koordinasi) secara sistematis pada suatu proyek dengan menggunakan sumber daya yang ada secara efektif dan efisien agar tercapai tujuan proyek secara optimal. Analisis Manajemen Konstruksi Pada Proyek Pembangunan Gedung Rawat Inap Kelas III RSUD Waled Kabupaten Cirebon ini meliputi Perhitungan Volume, RAB, Rekapitulasi Biaya dan Analisa Harga Satuan Pekerjaan, dengan menggunakan metode CPM (Critical Path Method) merupakan suatu metode dalam mengidentifikasi jalur atau item pekerjaan yang kritis. Metode CPM memecahkan masalah dengan perhitungan maju dan mundur. Dari perhitungan bobot pekerjaan berdasarkan analisis Barchart, Kurva S dan penjadwalan CPM Pembangunan Gedung Rawat Inap Kelas III RSUD Waled Kabupaten Cirebon membutuhkan waktu selama 165 hari (23 minggu) dengan perkiraan biaya kurang lebih sebesar Rp. 6,913,806,100,-.Kata Kunci : Manajemen Proyek, Bar Chart, Kurva S, CPM (Critical Path Method).
The Influence of Occupational Health and Safety and the Work Environment on Worker Productivity Dhea Rosita K; Syabikah Intan A; Moch Alfatun J; Nikko Rozy
Jurnal Health Sains Vol. 5 No. 12 (2024): Jurnal Health Sains
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/jhs.v5i12.1337

Abstract

Occupational safety and health are very fundamental for companies, because the impact of work accidents is not only detrimental to workers, but also the company. The aim of this research is to determine how much influence Occupational Safety and Health and the Work Environment influence Worker Productivity. This research uses primary data, namely a questionnaire distributed to 55 PT Arteria Daya Mulya Cirebon. Data analysis methods use Instrument Tests including Validity Tests, Reliability Tests, Classical Assumption Tests including Normality Tests, Multicollinearity Tests, Regression Analysis Tests including Multiple Linear Regression Analysis, Determination Coefficients, and Hypothesis Tests including T Tests (partial) and F Tests (simultaneous) which was processed using the IBM SPSS version 23.0 for Windows application. The research results show that Occupational Health and Safety has a significant effect of 0.000 < 0.05 and the calculated t value > t table (9.991 > 0.1674), meaning that Ho is rejected and Ha is accepted. So it can be concluded that occupational health and safety variables have a positive and significant effect on worker productivity. Then the Work Environment has a positive and significant effect on Worker Productivity with a significance value of 0.000 < 0.05 and a calculated t value > t table (11.735 > 1.674), meaning that Ho is rejected and Ha is accepted. So it can be concluded that the Work Environment variable has a positive and significant effect on Worker Productivity. Occupational Health and Safety and the Work Environment together (simultaneously) have a significant positive effect on Worker Productivity as seen from the significance value of 0.000 < 0.05 and the calculated f value > f table (82.690 > 3.17), meaning that Ho is rejected and Ha accepted. So it can be concluded that the Occupational Health and Safety and Work Environment variables together have a positive and significant influence on Worker Productivity with an adjusted R square value of 76.1%.