Wendy Supriatna
Universitas Subang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Implementasi Software Pvsyst Untuk Perancangan PLTS Offgrid Di Kecamatan Binong Kabupaten Subang Wendy Supriatna
Jurnal Kendali Teknik dan Sains Vol. 1 No. 3 (2023): Juli : Jurnal Kendali Teknik dan Sains
Publisher : Universitas Katolik Widya Karya Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59581/jkts-widyakarya.v1i3.1204

Abstract

The Meteorology, Climatology and Geophysics Agency predicts a long dry season will occur in Subang Regency in 2023 with the potential for El Nino for the next one year. Subang's solar energy potential reaches 4.8 kWh/M2. Solar energy is used to irrigate rice fields in Binong. The energy produced by solar panels is converted to motion energy which is used to suck up water. In this study it was found that solar energy produced by solar panels can drive an electric motor with a load of 2.4 kW for 6 hours which is used to meet the water needs in the fields.