Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS PENYEBAB KETERLAMBATAN PROSES PRODUKSI PROYEK CRADLE DENGAN METODE FAULT TREE ANALYSIS (FTA) Deni Lorenza; Taufiq Rahman
JURNAL LOGISTICA Vol. 1 No. 2 (2023): Vol.1 No. 2 Juni 2023
Publisher : LPPM-ITEBA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. XXX Batam merupakan perusahaan kontraktor engineering yang bergerak pada bidang engineering, procerument, manufacturing dan instalation. Saat ini perusahaan xxx sedang menjalankan proyek cradle. Perusahaan memiliki target untuk dapat menyelesaikan proyek tersebut secara tepat waktu sesuai dengan waktu perencanaan antar perusahaan dan konsumen. Perusahaan xxx memantau setiap proses produksi proyek cradle, baik itu dalam masalah-masalah keterlambatan proses proyek cradle yang sering terjadi. Analisa setiap permasalahan keterlambatan proses proyek cradle adalah dengan menggunakan metode fault tree analysis. Tujuannya dilakukan analisa masalah tersebut untuk dapat menemukan akar masalah dan penyebab terjadinya keterlambatan proses produksi proyek cradle. Hasil dari dilakukannya analisa dengan metode tersebut, terdapat beberapa akar masalah yang menyebabkan terjadinya keterlambatan proses produksi cradle diantaranya, keterlambatan proses fit up dimana yang menjadi akar masalahnya adalah kesalahan pada gambar dan spesifikasi, terdapat miss komunikasi antar pekerja, pekerja belum memiliki pengalaman, pekerja yang belum memiliki sertifikasi, pekerja yang kurang teliti dalam bekerja. Selanjutnya ada keterlambatan proses full weld, keterlambatan proses blasting/primer dan penambahan proses cleaning visual. Masalah tersebut yang menyebabkan waktu pengerjaan tidak sesuai dengan waktu perencanaan perusahaan.
ANALISIS KELAYAKAN USAHA PAVING BLOCK BERBAHAN SAMPAH PLASTIK MENGGUNAKAN BMC DAN PESTLE ANALYSIS Rekha Rahmania Widiansah; Ansarullah Lawi; I Made Sondra Wijaya; Deni Lorenza
JURNAL REKAYASA SISTEM INDUSTRI Vol 11 No 2 (2026): Mei 2026
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v11i2.11529

Abstract

Plastic waste is a severe environmental issue in Batam City, where approximately 1,000 tons of waste are generated daily. With 20-30% being plastic and only 17% managed effectively, there is an urgent need for innovative waste reduction solutions. This study conducts a business feasibility analysis of transforming HDPE and LDPE plastic waste into environmentally friendly paving blocks. The research aims to evaluate this sustainable business opportunity utilizing the Business Model Canvas (BMC) to design internal strategies and PESTLE Analysis to assess external macro-environmental factors.The results of the BMC framework reveal a highly viable model targeting environmentally conscious communities, educational institutions, and cafés. The value proposition centers on offering affordable, durable, and eco-friendly construction materials. Key operations involve waste collection, processing, and strategic partnerships with local waste banks and government agencies. Revenue is primarily generated from product sales and collaborative sustainability projects. Concurrently, the PESTLE analysis highlights favorable political support and low economic production costs as significant strengths. Socially, community response is positive, though market awareness requires expansion. Technologically, the production utilizes easily accessible equipment. Legally, obtaining national certification (SNI) is essential for broader market penetration. Environmentally, the business significantly reduces plastic pollution. In conclusion, manufacturing plastic waste-based paving blocks is a highly feasible sustainable business that promotes a circular economy, creates economic value, and mitigates severe local environmental degradation.