PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PEKERJAAN PLESTERAN (Studi Kasus : Proyek Pembangunan Masjid Babbusalam Sabil Barakah) Kgs. M. Widi Atmiko; Zuul Fitriana Umari; Bazar Asmawi; Verinazul Septriansyah
LATERAL: Jurnal Teknik Sipil Vol 2 No 2 (2024): Jurnal Teknik Sipil LATERAL
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Tridinanti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52333/lateral.v2i2.339

Abstract

A project is a temporary activity that has clear goals and objectives, lasts for a limited period of time, with a certain cost allocation. This research was conducted to find out how much labor productivity there is in plastering work on the Babbusalam Sabil Barakah Mosque construction project and what factors influence the productivity of plastering work on the Babbusalam Sabil Barakah Mosque construction project. The research was conducted by observing the productivity level of 32 workers and accompanied by filling out a questionnaire. Productivity observations used the work sampling method by calculating worker utility factors which were carried out for 3 days for each worker. The average value of the worker productivity utility factor in plastering work on the Babbusalam Sabil Barakah Mosque construction project is 89.57%. The variables that have been determined have a significance of 0.000<0.005 (the required sig) so that they simultaneously have an influence on the level of productivity. Partially, 9 factors that influence the productivity variable have a calculated T value for each variable that exceeds the T table value of 2.074.
ANALISIS PERBANDINGAN RENCANA ANGGARAN BIAYA DENGAN RENCANA ANGGARAN PELAKSANAAN (STUDI KASUS: PEMBANGUNAN RUMAH SUBSIDI PRITA RESIDENCE 2) Verinazul Septriansyah; Muhammad Ismail; Zuul Fitriana Umari; Bazar Asmawi; Lega Reskita Lubis
LATERAL: Jurnal Teknik Sipil Vol 3 No 1 (2025): Jurnal Teknik Sipil LATERAL
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Tridinanti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52333/lateral.v3i1.595

Abstract

The development of the construction industry in Indonesia is progressing rapidly, as evidenced by the increasing number of buildings, bridges, roads, and other structures built to meet the needs of the community. In 2022, the population of Banyuasin reached 839,401 people, with 89.23% owning their own homes, 1.81% renting, 7.00% living rent-free, and the remaining 1.96% falling into other categories. The Permen PUPR 2023 method is a cost calculation approach that includes components such as labor, materials, and equipment to determine unit prices for specific types of work. Meanwhile, the real method involves calculating coefficients based on manual calculations of the quantities of materials and wages used, adjusted to the specific work being carried out. The aim of this research is to determine the total cost values calculated using both methods—Permen PUPR 2023 and the real method—and to compare the differences between these total costs in the construction of the Prita Residence 2 subsidized housing project. Cost estimation was conducted based on the building volume calculated from the project drawings. Based on data processing, the Permen PUPR 2023 method resulted in a cost of Rp. 137,874,758, while the real method yielded a cost of Rp. 97,316,225, with a percentage difference of 29.41%.