Heni Fitriani
Fakultas Teknik, Universitas Sriwijaya, Indonesia

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analysis Of The Fulfillment Of The Housing Backlog Low-Income Community (MBR) And The Amount Of Land Used In The City Of Palembang Didy Aribowo; Heni Fitriani; Febrian Hadinata
Eduvest - Journal of Universal Studies Vol. 4 No. 4 (2024): Journal Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v4i4.1184

Abstract

This study aims to analyze the amount of low-cost housing backlog (MBR) in the city of Palembang in 2025; calculate the number of uninhabitable houses as an addition to the housing backlog figure; calculate the land requirement for MBR housing in meeting the backlog in the city of Palembang; analyze the zoning for the placement of MBR housing with spatial patterns and spatial structures. This research uses a descriptive research method with a quantitative approach. The study was conducted in the city of Palembang, which is the seventh city with the highest housing backlog in Indonesia, with a backlog figure reaching 122,932 houses. Data collection was done through face-to-face interviews by asking questions to the chairman of the South Sumatra Real Estate Association, the Palembang City Perkim Department, about housing backlog in Palembang. Data analysis used the Cambridge method, Sustainable Development Goals method, Minister of Public Works and Public Housing Regulation No.995/KPTS/M/2021 method, & Regional Regulation No.05 of 2022 method. The latest backlog figure recorded in 2018 was 122,932 dwellings (Palembang City Perkim Department, 2021). Uninhabitable houses (RTLH) in Palembang in 2019 experienced a decrease and continued to increase in 2020. The effective land requirement for MBR housing and Fasum Fasos with a ratio of 60:40 is calculated, followed by data on built houses according to REI data in Palembang. The zoning for the placement of MBR housing land in Palembang, which reached 4,987.62 ha in 2025, must consider the spatial patterns and spatial structures of Palembang City.
Comparative Analysis Of Water Network Demand And Development With The Availability Of Clean Water In The Regional Drinking Water Company (RDWC) Lematang Enim Diki Ernando; Heni Fitriani; Febrian Hadinata
Eduvest - Journal of Universal Studies Vol. 4 No. 4 (2024): Journal Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v4i4.1191

Abstract

This study aims to analyze the projected demand for clean water and assess the existing condition of the clean water network in relation to the projected population growth in the next 10 years; Analyze the availability of water discharge from the Lematang Enim RDWC water source in meeting those needs; Analyze the development of clean water distribution networks. This research was conducted from August to December 2023. The research location is in Gelumbang Subdistrict, Muara Enim Regency. Data were collected through interviews using questionnaires related to performance, availability, and distribution of water. The results of the study show that the water demand from projection results increases every year from 2022 to 2041; the availability of water from the Lematang River is still sufficient for drinking water needs; The water needs of Gelumbang sub-district in 2032 from the calculation results obtained domestic needs of 165,403.6 m3/day, Non-domestic needs of 419.68 m3/day, and water loss of 33,164.656 m3/day; The total demand for discharge over the next 10 years (2022-2032) to meet 413,731 SL is 198,987.936 m3/day. Thus, there is an increase in the number of customers from 2022-2032 by 113,348 so that the additional distribution network needed by the Lematang Enim RDWC to meet the discharge is 45,339.2 m3/day from 2023 to 2032, totaling 113,348 so that the additional distribution network needed by the Lematang Enim RDWC to meet the discharge is 45,339.2 m3 from 2023 to 2032.