PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA ROOFTOP PENSUPLAI KANDANG AYAM PEDAGING DENGAN SISTEM ON GRID DI DESA TEGALHARJO TRANGKIL PATI Ahmad Firna Nariyana; Ida Widihastuti; Dedi Nugroho
Elektrika Vol. 16 No. 1 (2024): April 2024
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v16i1.8818

Abstract

ABSTRACTThe public is increasingly interested in the broiler chicken business as a business venture because market demand for broiler chickens is increasing. The aim of this research is to measure the amount of electricity used in the chicken coop and create a daily load schedule for one month, determine the capacity of the solar panels based on the area roof that is currently used, and designing a PLTS system to meet the needs of the chicken coop and creating an electricity loading pattern of 50% PLTS and 50% PLN. The data collection methods used are observation, calculation, literature study and geographical study. The results of this research after carrying out calculations to meet the power requirements needed to supply the electricity needs in the chicken coop are 12.15 kW of the power that will be produced by PLTS using a 405 Wp capacity module with a total of 30 solar panels arranged in series of 5 and parallel. 6 which will produce a maximum array voltage of 210 volts and a maximum current of 57.9 Amperes which will produce a power of 12.15 kW. Solar irradiation in chicken coops in Tegalharjo Trangkil Village varies throughout the year, with the planning design utilizing the lowest solar radiation intensity value in January (4.38 kWh/m2/day) and an average solar radiation intensity of 5.43 kWh/m2/day to guarantee maximum electrical energy output throughout the year.      Keywords: Broiler Coop, PLTS, On Grid ABSTRAKMasyarakat semakin tertarik dengan bisnis ayam broiler ini sebagai sebuah usaha bisnis karena permintaan pasar terhadap ayam broiler yang semakin meningkat. Tujuan dari penelitian ini adalah mengukur jumlah listrik yang digunakan di kandang ayam dan buat jadwal beban harian selama satu bulan, menentukan kapasitas panel surya berdasarkan luas atap yang digunakan saat ini, dan merancang sistem PLTS untuk memenuhi kebutuhan kandang ayam dan membuat pola pembebanan listrik yaitu 50%  PLTS dan 50% PLN. Metode pengumpulan data yang digunakan adalah observasi, perhitungan, studi literatur dan studi geografis. Hasil dari penelitian ini setelah melakukan perhitungan untuk mencukupi kebutuhan daya yang diperlukan untuk mensuplai kebutuhan listrik dikandang ayam yaitu sebesar 12,15 kW dari daya yang akan dihasilkan PLTS menggunakan modul berkapasitas 405 Wp dengan jumlah panel surya sebanyak 30 buah yang disusun secara seri 5 dan parallel 6 yang akan menghasilkan tegangan maksimum array yang akan dibangkitkan sebesar 210 volt dan arus maksimum 57,9 Ampere yang akan menghasilkan daya sebesar 12,15 kW. Iradiasi matahari pada kandang ayam di Desa Tegalharjo Trangkil bervariasi sepanjang tahun, dengan rancangan perencanaan memanfaatkan nilai intensitas radiasi matahari terendah bulan Januari (4,38 kWh/m2/hari) dan rata-rata intensitas radiasi matahari sebesar 5,43 kWh/m2/hari untuk menjamin keluaran energi listrik maksimum sepanjang tahun. 
ANALISA PENGARUH PERUBAHAN FREKUENSI DAN TEGANGAN TERHADAP EFISIENSI MOTOR INDUKSI TIGA FASA MENGGUNAKAN MATLAB SIMULINK Sulis Diantoro; Dedi Nugroho; Agus Adhi Nugroho
Elektrika Vol. 16 No. 2 (2024): Oktober 2024
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v16i2.8852

Abstract

The three-phase induction motor is one of the most widely used types of electric motor in the industrial world. In its application to regulate the speed and improve the efficiency of the motor used the method of Variable frequency drive (VFD) by changing the input frequencies. The final task uses a simulated simulation method of the simulink matlab that will analyze the influence of frequency and voltage changes on speed, slip, and motor efficiency. The results show that frequency and voltage changes have an impact on induction motor performance that includes speed, slip, and efficiency. Often, they scream and shout. From a frequency of 50 Hz, every 10 percent decrease in the Frequency then the speed also decreases by about 10 percent. Frequencies of 50 Hz and 45 Hz produce speeds of 1440 rpm and 1295 rpm. For the slip, the increase in frequency leads to a decrease in the motor slip value. At the frequencies of 50 Hz and 45 Hz produced slide values of 4% and 16%. The highest efficiency is given at a torque load of 5 Nm and a frequency of 50 Hz with an efficiency of 97%. Keywords: 3-phase induction engine, VFD, Matlab, Frequency, Speed, Slip, Efficiency ABSTRAK Motor induksi tiga fasa adalah salah satu jenis motor listrik yang paling banyak digunakan dalam dunia industri. Dalam penerapannya untuk mengatur kecepatan dan meningkatkan efisiensi motor digunakan metode Variable frequency drive (VFD) dengan mengubah frekuensi masukan. Penelitian ini menggunakan metode simulasi matlab simulink yang akan menganalisa mengenai pengaruh perubahan frekuensi dan tegangan terhadap kecepatan, slip, dan efisiensi motor. Hasil penelitian menunjukkan bahwa perubahan frekuensi dan tegangan mempunyai dampak terhadap kinerja motor induksi yang meliputi kecepatan, slip, dan efisiensi. Frekuensi berbanding lurus dengan kecepatan dan efisiensi. Dari frekuensi 50 Hz, setiap penurunan frekuensi 10% maka kecepatan juga turun sekitar 10%. Frekuensi 50 Hz dan 45 Hz menghasilkan kecepatan 1440 Rpm dan 1295 Rpm. Untuk slip, kenaikan frekuensi menyebabkan turunnya nilai slip motor. Pada frekuensi 50 Hz dan 45 Hz menghasilkan nilai slip 4% dan 16%. Sedangkan untuk nilai efisiensi tertinggi terjadi ketika diberi beban torsi 5 N.m dan frekuensi 50 Hz dengan efisiensi sebesar 97%.
ANALISIS SUSUT NON TEKNIS BERDASARKAN LOAD PROFILE DAN JAM NYALA PADA PELANGGAN AMR (AUTOMATIC METR READING) PT PLN (PERSERO) UP3 BIMA Anggi Rachmawati; Dedi Nugroho
Elektrika Vol. 17 No. 1 (2025): April 2025
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v17i1.11498

Abstract

Technical and non-technical losses occurs when PLN distributes electricity from generators to customers. To reduce this loss, namely by grouping based on running hours and monitoring the customer's Load Profile parameters. Analysis of research is needed to reduce non-technical losses, especially for large power customers who use the AMR system, such as 189 UP3 Bima customers. In this research, 2 customers experienced a decrease in operating hours exceeding 100 hours, with indications of measurement anomalies in these customers. After normalizing the system, there was uncollected electricity usage from 2 customers totaling 120,457.43 kWh which had not been paid for. PLN UP3 Bima managed to reduce the shrinkage rate by 16% of the total non-technical shrinkage in June 2024 with a total of 749,686 kWh. Keywords: Electricity distribution, kWh meter, non-technical losses.    ABSTRAK Susut teknis dan non teknis terjadi saat PLN mendistribusi tenaga listrik dari pembangkit hingga ke pelanggan. Untuk mengurangi susut tersebut yaitu dengan cara mengelompokkan berdasarkan jam nyala serta memantau parameter Load Profile pelanggan tersebut. Dibutuhkan suatu analisa atau penelitian, untuk menekan susut non teknis terutama pada pelanggan berdaya besar yang menggunakan sistem AMR, seperti pada pelanggan UP3 Bima sebanyak 189 pelanggan. Pada penelitian ini ada 2 pelanggan yang mengalami penurunan jam nyala melebihi 100 jam, dengan indikasi adanya anomali pengukuran di pelanggan tersebut. Setelah dilakukan penormalan sistem terdapat pemakaian tenaga listrik belum tertagih dari 2 pelanggan total sebesar 120.457,43 kWh yang belum terbayar. PLN UP3 Bima berhasil menekan angka susut sebesar 16% dari total susut nonteknis bulan Juni 2024 dengan jumlah 749.686 kWh.