This Author published in this journals
All Journal Serambi Engineering
Yayok Suryo Purnomo
Jurusan Teknik Lingkungan, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Potensi Kecelakaan Kerja Dengan Metode Job Safety Analysis Pada Pekerjaan Produksi Fiberglass di CV. Jaya Mandiri Sidoarjo Muhammad Rifqi Naufal; Yayok Suryo Purnomo
Jurnal Serambi Engineering Vol. 9 No. 3 (2024): Juli 2024
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Companies as providers of various products are obliged to implement Occupational and Health guidance, this effort is made to avoid the risk of accidents and work-related illnesses. Work accidents are often related to negligence or disobedience to work safety rules by workers which is generally caused by the worker's minimal level of knowledge. This research uses observational analysis with an inductive analysis approach and data is processed using the JSA and HIRARC methods and uses observational analysis with a cross-sectional approach whose samples are production workers. The results show that there are 6 workers with low knowledge characteristics, 7 workers with medium knowledge, and 17 workers with high knowledge. In the attitude aspect, there are 4 workers with a low level, 1 worker with a medium level, and 25 workers with a high level. And in the behavioral aspect there are 6 low level workers, 1 medium level worker, and 23 high level workers. The results of the analysis of the activity of making buckets from fiberglass showed that there were 7 sources of danger including being scratched by a razor blade, slipping, being stabbed by a sharp splinter, being exposed to chemicals, the smell of chemicals, tripping while walking, being pricked by a sewing needle. From the results, 2 potential risks were obtained with low risk values, 5 potential risks with medium risk values, and 3 potential risks with high risk values