Analysis of Barrier and Driver Factors to Risk Monitoring and Control Implementation in Construction Projects Almutahir Almutahir; I Putu Artama Wiguna
Jurnal Indonesia Sosial Teknologi Vol. 5 No. 5 (2024): Jurnal Indonesia Sosial Teknologi
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jist.v5i5.1077

Abstract

Construction projects inherently involve risks. If proper risk management practices are not employed, the likelihood of cost overruns can reach more than 80%. Risk monitoring and control are essential processes in risk management; however, their implementation is inadequate in construction projects. This research analyzed the main barriers and drivers for implementing risk monitoring and control in construction projects. A questionnaire survey was conducted using a Likert scale to measure respondents' perceptions. Data were collected from 71 respondents: top management, project managers, project risk managers, and risk officers. This study employs descriptive analysis and factor analysis to achieve the objectives. The results indicate that the 19 identified barriers to risk monitoring and control were categorized into 4 main factors: lack of practice, lack of risk awareness, lack of incentives and having difficulty finding methods, and misperceptions about risk monitoring and control. Meanwhile, the 21 drivers were categorized into 5 main factors: management support, tools and information technology, organizational structure and communication, external environment, assigning responsibility, and contingency reserve.
Analysis of Supporting and Hindering Factors for the Implementation of BIM and GIS Integration in IKN Projects Fatkhur Rozaq; I putu artama wiguna
Jurnal Indonesia Sosial Teknologi Vol. 5 No. 6 (2024): Jurnal Indonesia Sosial Teknologi
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jist.v5i6.1154

Abstract

The relocation of Indonesia's capital city from Jakarta to IKN (Capital City of the Archipelago) in Penajam Paser Utara is a monumental project covering an area of 2,876 hectares, which involves massive infrastructure development. To ensure the success of IKN development and development based on the principles in Law Number 3 of 2022 including equality, technological balance, resilience, sustainable development, livability, connectivity, and smart cities. BIM-GIS integration technology was key in managing the complexity of this project. With BIM-GIS integration, it supports digital transformation for more efficient and complete decision-making, including spatial variabels. This thesis aims to analyze the factors that influence the implementation of BIM-GIS integration technology in the early stages of IKN project development. Exploratory factor analysis methods are used to identify supporting factors that facilitate the successful implementation of BIM-GIS integration, as well as inhibiting factors that may hinder it. Questionnaires are used as a data collection tool from stakeholder respondents in IKN projects. Questionnaire data was analyzed using Exploratory Factor Analysis (EFA). The research results showed that there were 16 supporting factors with 4 component groups and 16 inhibiting factors with 6 component groups. Based on these results, strategic steps are proposed to contribute to the development of science and play a role in the successful relocation of Indonesia's capital city.
Analysis of Strategies to Improve the Financial Feasibility of the Rantauprapat–Kisaran Toll Road Section Nindyonawi Pradipto; I Putu Artama Wiguna
Journal La Multiapp Vol. 7 No. 4 (2026): Journal La Multiapp
Publisher : Newinera Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37899/journallamultiapp.v7i4.5093

Abstract

The Rantauprapat–Kisaran Toll Road is a strategic part of the Trans-Sumatra corridor that supports connectivity and regional economic development in North Sumatra, Indonesia. However, the baseline financial analysis indicates that the project is not financially feasible, with a Financial Internal Rate of Return (FIRR) of 8.351%, a negative Net Present Value (NPV) of IDR 3,971 billion, and a Payback Period (PP) of 15.95 years. This study aims to identify appropriate strategies for improving project feasibility and assess the sensitivity of financial indicators to key parameters. A quantitative descriptive case study was conducted using Discounted Cash Flow modeling. Financial feasibility was evaluated through NPV, FIRR, and PP, while alternative strategies were assessed using single and combined scenarios involving tariff adjustments, CAPEX and O&M efficiencies, financing optimization, and Viability Gap Funding (VGF). The findings show that no single strategy satisfies all feasibility criteria. Achieving the minimum FIRR would require a tariff increase of 123.45%, VGF support of 62.84% of project costs, or CAPEX and O&M reductions of 56.91%. The optimal combination consists of 10% VGF support, CAPEX and O&M efficiencies, and a financing structure of 70% debt and 30% equity. This scenario produces an FIRR of 11.72%, a WACC of 7.56%, an NPV of IDR 12,658 billion, and a PP of 11.84 years. Sensitivity analysis identifies revenue and CAPEX as the most critical variables, highlighting the importance of revenue assurance and effective cost control.