The Risk Analysis of Work Accidents Using The Bowtie Method in The Ciputra Hospital Construction Project Risda Yasinta Dewi; I Nyoman Dita Pahang Putra
Jurnal Teknik Sipil Vol. 17 No. 1 (2024): Juni 2024
Publisher : Faculty Of Engineering University 17 August 1945 Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56444/jts.v17i1.1566

Abstract

The condition of work accident risk is a critical factor that needs to be taken seriously. Related to the construction of the Ciputra Hospital Project located on Jl. Made Selatan - Citraland Surabaya, the Ciputra Hospital project is planned to be built on nine floors with a building area of 23,000 m2, which will allow for various occupational accident risks. So, a risk analysis is needed to identify hazards that can occur. In this study, data collection was carried out through interviews and also distribution questionnaires. Questionnaires are used to find probability and severity scales, and questionnaires are distributed to project expert staff. After obtaining the results from the questionnaire, a risk assessment is carried out by finding the probability index and severity index and then determining the category with the risk matrix. After determining the category, the analysis was carried out using the bowtie method. The result of this study is to determine the most dominant risks, namely workers being punctured by sharp equipment when installing formwork, workers falling from a height when installing formwork, and workers being hit by a bar bender machine when forming. After analyzing using the bowtie method, it was found that the causes of the risk of accidents that occurred included workers in a tired condition, lack of concentration, and carelessness, incomplete use of PPE, undisciplined workers at work, no safety at the job site, bad weather, inexperienced workers, poor machine conditions.
The Implementation of BIM Tekla Structure on Quantity Take Off for Structural Works of X Building Project Eka Aprillia; I Nyoman Dita Pahang Putra
Jurnal Teknik Sipil Vol. 17 No. 1 (2024): Juni 2024
Publisher : Faculty Of Engineering University 17 August 1945 Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56444/jts.v17i1.1567

Abstract

BIM technology in the construction world is growing. However, the application of BIM in Indonesia has not been carried out thoroughly. BIM technology can help quantity take off work that affects the success or failure of a project. BIM can reduce the error rate of quantity take off planning calculations compared to manual calculations. Tekla Structure is one of the software developments of BIM that can produce quantity take off building output along with 3D visualisation. This research conducts 3D modelling and discusses the comparison of quantity take off using BIM-based software Tekla Structures with a recap of the manual calculation contained in the initial Bill of Quantity for the X Building Project planning. This difference can be used as a consideration for the application of BIM in the initial calculation of project planning. The percentage difference obtained for the pile cap resulted in concrete volume deviation of 0.69% and -19.1% for reinforcement volume. The spun piles work resulted in a concrete volume deviation of -0.8% and reinforcement volume of 8.45%. In the calculation of column work, the deviation value for concrete volume is 3.14%, while the volume of reinforcement is -12.2%. The results of the BIM quantity take-off are deemed more reliable due to the 3D visualization of BIM objects and the ability to adjust the detail of work elements.