Andi Sri Rezeky Aprillia S
Program Studi Teknik Sipil Fakultas Teknik Universitas Bosowa

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Kinerja Mobilisasi Bahan Dan Peralatan Pada Pekerjaan Konstruksi : Studi Kasus Pembangunan Jalur Kereta Api Lintas Makassar-Parepare Andi Sri Rezeky Aprillia S; Ahmad Yauri Yunus; Savitri Prasandi Mulyani
Jurnal Penelitian Teknik Sipil Konsolidasi Vol. 1 No. 1 (2023): Jurnal Penelitian Teknik Sipil Konsolidasi, Januari 2023
Publisher : Program Studi Teknik Sipil Universitas Bosowa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study was to analyze the effect of the performance of the mobilization of materials and equipment, the advantages of mobilizing materials and equipment and the weaknesses of the mobilization of materials and equipment on the mobilization of materials and equipment and to determine the most influential variables. This study uses quantitative methods with the number of respondents as many as 55 people. The instrument testing uses validity and reliability tests, while the data analysis method uses multiple linear regression with the F test and t test. The results showed that the variables of Material and Equipment Mobilization Performance (X1), Excess Mobilization of Materials and Equipment (X2) and Weaknesses of Materials and Equipment (X3) simultaneously affected the Mobilization of Materials and Equipment Equipment (Y), Based on the t-test, the variable Performance Mobilization of Materials and Equipment (X1), Advantages of Mobilization of Materials and Equipment (X2), and Weaknesses of Mobilization of Materials and Equipment (X3) have a positive and significant effect on Mobilization of Materials and Equipment (Y). and the value of Adjusted R Square which means the influence of the independent variable on the dependent variable is 71.4%.