This Author published in this journals
All Journal Serambi Engineering
Alif Illyasa Putra Yuswandi
Program Studi Teknik Lingkungan, Institut Teknologi Nasional

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Dampak Peningkatan Air Larian (Run Off) Pada Tahap Konstruksi dan Operasi di Pabrik Sepatu PT.X Kabupaten Cirebon Alif Illyasa Putra Yuswandi; Eka Wardhani
Jurnal Serambi Engineering Vol. 9 No. 4 (2024): Oktober 2024
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Population development in Cirebon Regency has led to increased land use, resulting in a reduction in water catchment areas, which is one of the factors causing inundation. One of the factors that causes puddles is running water or runoff due to rainfall and rain intensity that exceeds the speed of the soil's absorption capacity. In this research, measurements were made of the increase in runoff water discharge during the construction and operation stages of PT. X. PT. X has a land area of 36.6 ha. The research locations are in the Priuk Block, Pabedilan Kulon Village, Pabedilan District, and the Plaza Block in Damarguna Village, Ciledug District, Cirebon Regency. So, it is necessary to carry out runoff water analysis, starting with hydrological analysis, to obtain rainfall intensity values. The I value was obtained at 152.30 mm/hour. The land used for construction and operations is rice fields and plantations, with a value of C = 0.5 for plantations and 0.8 for rice fields. The frequency used is 0.278. So, the result of increasing runoff water discharge for the construction and operation stages is 3,744 m3/sec.