Analisis Penjadwalan Proyek Gedung Bertingkat (Studi Kasus Proyek Renovasi Depo Rokok Dan Gedung Parkir 3 Lantai PT. Gudang Garam) Mafrukha, Ainin; Ayu Ratna Winanda, Lila; Kartika, Deviany
Jurnal Teknik Sipil Vol. 9 No. 2 (2024): De'Teksi : Jurnal Teknik Sipil
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/deteksi.v9i2.954

Abstract

Proyek konstruksi merupakan rangkaian kegiatan yang berkaitan untuk mencapai tujuan dengan batasan waktu tertentu. Proyek konstruksi selalu berkaitan dengan sumber daya (resources) yaitu manusia (man), bahan banguan (material), peralatan (machine), metode pelaksanaan (method), uang (money), informasi (information), dan waktu (time). Sebelum pelaksanaan proyek konstruksi selalu dilakukan penjadwalan untuk menentukan berapa lama waktu penyelesaian suatu proyek. Dalam merencanakan penjadwalan proyek Renovasi Depo Rokok dan Gedung Parkir 3 Lantai PT. GUDANG GARAM penulis menggunakan metode PDM (Precedence Diagram Method) dengan program bantu Microsoft project. Tujuan dari jurnal ini adalah untuk mengetahui berapa lama durasi pengerjaan proyek konstruksi dan menentukan lintasan kritis serta non kritis suatu pekerjaan. Hasil dari penjadwalan menggunakan Microsoft Project menunjukkan waktu yang dibutuhkan yaitu 258 hari dan terjadinya lintasan kritis, overallocated jumlah pekerja pada sub pekerjaan. Oleh karena itu, dapat dilakukan penjadwalan ulang dengan metode percepatan untuk hasil efektif dan efisien.
Risk Management for the Self-Help Home Stimulant Assistance Program, Southeast Maluku Regency Asyani Kabalmay, Nirza; Mulyadi, Lalu; Ayu Ratna Winanda, Lila
Journal of World Science Vol. 3 No. 1 (2024): Journal Of World Science
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jws.v3i1.525

Abstract

The Self-Help Home Stimulant Assistance Program (BSRS) in Southeast Maluku Regency for the fiscal year 2023 faces potential risks that necessitate preventive measures to avert adverse consequences. This research aimed to identify, assess, and control the risks associated with the BSRS Program. The study employed literature reviews, interviews, and distributed questionnaires to 30 program stakeholders. The collected data underwent analysis using standard quantitative methods, encompassing risk identification, assessment, and control stages. Out of 19 risk variables, seven were categorized as Very High-Risk, five as High-Risk, and six as Moderate Risk. The research findings emphasize the imperative need for targeted control measures, such as enhancing coordination and technical activities, to mitigate and avoid identified risks in the BSRS Program implementation. The implications of this study extend beyond risk management, providing valuable insights for program improvement and sustainability. By addressing the identified risks, the BSRS Program can not only safeguard against potential negative outcomes but also enhance its effectiveness and long-term success, contributing positively to community welfare in Southeast Maluku Regency. This research serves as a foundation for informed decision-making, fostering a more resilient and robust implementation of stimulant assistance programs in the region.