Malawat, Zainal Abidin
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perhitungan Harga Pokok Produksi Pembuatan Canopy Pada CV Latahzan Di Kota Ambon Malawat, Zainal Abidin; Musaid, Sri Astuti Musaid
Journal of Applied Accounting Vol 3 No 1 (2024): JUNI
Publisher : ISAS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaa.v3i1.819

Abstract

CV Latahzan is one of automatic vehicle store that producing all goods made of iron. The objective of this research is to know how much the main production cost of canopy product at CV Latahzan on September 2023. The data analysis technique that used by the researcher is the calculation of main production cost of canopy product using full costing method. The result of this research shows that the main production cost of 2 x 5 size canopies is IDR 15.942.000Keywords ; Cost Of Goods Sold, Full Costing Method