Siagian, Alfandri
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

KAJIAN TEKNIS INTEGRASI PHOTOVOLTAIC PADA PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) KALI JARI UNTUK MENGATASI KEBUTUHAN DAYA PELANGGAN Siagian, Alfandri; Utomo, Teguh; Hasanah, Rini Nur
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Currently, the Kali Jari MHPP located in Gandusari district of Blitar has supplied as many as 28 customers with a maximum power on an installed load of 6.16 kVA. As time goes by, the number of residents in this village will increase. It is estimated that by 2050, there will be 58 customers that will be supplied by the PLTMH Kali Jari with a maximum power at installed load of 12.76 kVA. Therefore, it is necessary to carry out studies to make power additions to the installed capacity. Using a renewable energy source, the intensity of abundant solar radiation, the addition of power to the installed capacity can be achieved by using the hybrid Kali Jari MHPP system with a photovoltaic system. To meet the power shortage, the photovoltaic system is designed with other supporting components. The design of this photovoltaic system uses a module with a capacity of 300 Wp of 15 pieces, 48 V 100 Ah batteries of 4 pieces, Battery Control Regulator (BCR) with a maximum current of 70 A of 1 pieces, and a 3 phase inverter of 8 kW of 1 piece. Keywoards: Renewable Energy, MHPP, Photovoltaic, Hybrid System.