Claim Missing Document
Check
Articles

Found 3 Documents
Search

PENENTUAN WAKTU PENYALAAN LAMPU LALU LINTAS DI PERSIMPANGAN JALAN PANJANG JIWO DAN JALAN JAGIR Donoriyanto, Dwi Sukma
JURNAL TEKMAPRO Vol 1, No 1 (2006): JURNAL TEKMAPRO
Publisher : JURNAL TEKMAPRO

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (234.815 KB)

Abstract

ABSTRACT To the number of consumer of tired motor vehicle 2.602.654 for the region of Town of Madya Surabaya more and more problem of which is generated it among others is jam of roadway. Intersecting street of Length of Jiwo and road;street of Jagir Wonokromo represent intersection occupying peringkat 4 from entire/all intersecting street exist in Surabaya. Causing one of them is tuning of aflame of traffic lamp An method able to be utilized in overcoming the problem of jam of roadway there is many its manner and one of them is simulation method. Software able to finish the problem of multifarious of manner and in this case writer use Simul8 in finishing existing problems From result of which is got can know that enkindling of traffic lamp in intersecting street of Length of Jiwo and road;street of Jagir Wonokromo is that aflame time of green at Long joint streets of Longer Jiwo than other joint streets   Keyword : enkindling time, traffic light, simulation method. ABSTRAKSI   Banyaknya pengguna kendaraan bermotor yang mencapai 2.602.654 untuk wilayah Kota Madya Surabaya semakin banyak masalah yang ditimbulkannya diantaranya adalah kemacetan jalan raya. Persimpangan jalan Panjang Jiwo dan jalan Jagir Wonokromo merupakan persimpangan yang menduduki peringkat 4 dari seluruh persimpangan jalan yang ada di Surabaya.Adapun faktor – faktor yang menyebabkan salah satunya adalah penyetelan lama nyala lampu lalu lintas.   Suatu metode yang dapat dipergunakan dalam mengatasi masalah kemacetan jalan raya ada banyak ragamnya dan salah satunya adalah metode simulasi. Software yang dapat menyelesaikan masalah tersebutpun beraneka ragam dan dalam hal ini penulis menggunakan Simul8 dalam menyelesaikan permasalahan yang ada.   Dari hasil yang didapatkan dapat diketahui bahwa penyalaan lampu lalu lintas di persimpangan jalan Panjang Jiwo dan jalan Jagir Wonokromo adalah bahwa waktu nyala hijau pada ruas jalan Panjang Jiwo lebih lama daripada ruas jalan yang lain.   Kata – kata kunci : waktu penyalaan, lampu merah, metode simulasi.
A Penerapan Metode Statistical Quality Control Pada Pengendalian Kualitas Gula Ahdan, Muchammad 'Ahdan Sahali; Dwi Sukma Donoriyanto, Dwi Sukma Donoriyanto
JURNAL PENGABDIAN MASYARAKAT INDONESIA Vol. 3 No. 1 (2024): Februari : Jurnal Pengabdian Masyarakat Indonesia (JPMI)
Publisher : Pusat Riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jpmi.v3i1.3326

Abstract

PT. X is part of ID FOOD which focuses on the sugar cane agro-industry sector. SHS sugar is the main product. To ensure production meets consumer standards and expectations, it is necessary to implement quality control during the production process. This involves quality control, improvement and improvement of systems so that the products produced are superior and competitive. In writing this article, the author is interested in exploring the problem of product defects and deviations in the production process, including defective products, as well as efforts to improve and improve product quality. The problem solving method used is the new seven tools, with an emphasis on affinity diagrams, linkage diagrams, tree diagrams, and PDPC. The results of data analysis suggest solutions, including implementing appropriate SOPs at each stage of production, routine maintenance on equipment every milling season, and additional training for operators or workers to increase productivity and product quality
Analisis Risiko Kegagalan Proses Produksi Bakpia Menggunakan Metode FMEA Di Rumah Produksi Bakpia AS Sidoarjo Abdussalam, Isa; Dwi Sukma Donoriyanto, Dwi Sukma Donoriyanto
Jurnal Teknik Ibnu Sina (JT-IBSI) Vol. 9 No. 02 (2024): JT-IBSI (Jurnal Teknik Ibnu Sina)
Publisher : Fakultas Teknik Universitas Ibnu Sina

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36352/jt-ibsi.v9i02.976

Abstract

The bakpia production process, which consists of various stages, starting from selecting raw materials, mixing dough, baking, to packaging, has the potential risk of failure at each stage. These risks, if not managed properly, can reduce product quality, reduce customer satisfaction, and even cause business losses. The method used in the study was FMEA and proposed improvements with 5W + 1H. Based on the FMEA analysis, the risk with the highest Risk Priority Number (RPN) value was incorrect temperature settings (240). The 5W + 1H analysis revealed the main causes of this risk, namely uncalibrated ovens, uneven heat distribution, and lack of temperature monitoring during baking, which was carried out in the production area by workers. To reduce the risk, periodic oven calibration, use of temperature monitoring devices, worker training, and standardization of operational procedures are recommended. This study proves that the combination of FMEA and 5W + 1H methods is effective in helping MSMEs such as Bakpia AS in identifying, analyzing, and mitigating risks in order to improve product quality and operational efficiency