Implementation of Value Engineering in Bandung Islamic University Hospital Building Construction Salman Faruq, Reza; Sri Handayani, Fajar; Setiono, Setiono
Sustainable Civil Building Management and EngineeringĀ Journal Vol. 1 No. 4 (2024): October
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i4.3125

Abstract

Infrastructure development in Indonesia has increased sharply every year. Construction projects are starting to appear at a fairly high frequency in each region. However, in the process of project development, the quality, time, and cost aspects are not always optimal. Therefore, Value Engineering analysis is needed to get optimal results. This Value Engineering analysis is able to identify components that can be saved and determine alternatives to replace these components without reducing the quality or quality of work. The case study in this research is the Bandung Islamic University Hospital Construction Project. The Value Engineering analysis carried out on this project is a change in the work of the upper structure, such as slab, column and beam from conventional to precast concrete. In addition to Value Engineering analysis, this research also analyzed greenhouse gas emissions using Life Cycle Assessment analysis. The results showed savings of Rp 3,180,685,659.81 or 8.19% of the initial project cost. Meanwhile, the existing greenhouse gas emissions amounted to 9556.01 kgCO2e and for alternative work amounted to 72896.49 kgCO2e.
ANALISIS EARNED VALUE TERHADAP BIAYA DAN WAKTU GEDUNG DIREKTORAT POLITEKNIK PU SEMARANG DENGAN PRIMAVERA P6 Eka Nugraha, Noel; Sri Handayani, Fajar; Setiono, Setiono
Jurnal Riset Rekayasa Sipil Vol 8, No 1 (2024): September 2024
Publisher : Prodi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20961/jrrs.v8i1.85304

Abstract

Semarang PU Politeknik Building Construction Project is the construction of an educational building area developed in collaboration between PT Wika Gedung and PT Yodya Karya with a construction management consultant contract value of 3.9 billion and an executing contractor contract value of 281 billion. In this research, a research method with a quantitative descriptive approach was taken. This means that in this project, the condition of the project is described based on the analysis of the data obtained from the project. The data is then processed using descriptive and analytical methods. The Earned Value or EV concept method studies comparing the value of the work completed against the budget provided to carry out the work. The result of this research is to analyze using the Primavera P6 program whether the project is running at an appropriate cost and a schedule that does not deviate from the contract. The results of the analysis obtained for the implementation of the weekly analysis of the Earned Value indicator value obtained is positive which means that in the entire week of analysis, the project runs faster and more economically. The EAC and ETC values obtained are smaller than the contract cost, indicating that the project is planned to be completed at a smaller cost. The deviation value obtained is at an average of 0.08% with the smallest deviation being 0.0794% so the project will experience a profit of 8% on the completion date.