Developing a delay risk model for toll road construction project: A conceptual framework Pratama, G A; Latief, Y
Applied Engineering and Technology Vol 1, No 2 (2022): August 2022
Publisher : ASCEE

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (285.987 KB) | DOI: 10.31763/aet.v1i2.676

Abstract

In the realization of the medium-term development plan in 2014-2019 (RPJMN), toll road construction development was only reached 51 percent. construction projects had complex and dynamic nature, which caused delays, construction risk assessment that considers risk as a system was done before, for example, using techniques such as SD, Fuzzy DEMATEL, STEEP-SD, DEMATEL-ANP, and SD-DEMATEL, but the technique still has some shortcomings. in indonesia, research related to this matter is still rarely done, to address this concern, we propose a conceptual framework that can be used to develop a delay risk model for toll road construction project especially in indonesia. for this purpose, we introduce the system dynamic-fuzzy dematel-anp (sd-fdanp) method. the results of the development of the sd-fdanp method can be used as a guideline that can help achieve behavioral knowledge of delays and the success of risk assessment in toll road infrastructure development projects.