ANALISIS COST OVERRUNS PADA PROYEK X Mathew, Kevin; Waty, Mega
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 3, Agustus 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i3.30774

Abstract

Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai fasilitas umum lainnya. Dalam pelaksanaannya, proyek konstruksi sering kali mengalami pembengkakan biaya (cost overrun). Cost overrun adalah perbedaan antara biaya aktual yang dikeluarkan dalam pelaksanaan proyek dengan biaya yang telah direncanakan sebelumnya. Cost overrun merupakan hal dapat yang terjadi pada proyek konstruksi di seluruh dunia dan hal ini menyebabkan kerugian ekonomi. Dengan kata lain, pembengkakan biaya telah menjadi tantangan dalam mencapai keberhasilan konstruksi proyek. Penelitian ini merupakan studi kasus dari proyek Gedung sekolah dan gedung mess, dengan menggunakan metode wawancara dan perbandingan data RAP dan RAB. Dengan membandingkan RAB dan RAP dapat mengetahui jenis pekerjaan apa saja yang terjadi cost overrun dan menggunakan metode wawancara dapat diketahui faktor faktor apa saja yang menjadi penyebab utama cost overrun pada jenis pekerjaan tersebut. Hasil penelitian ini diharapkan memberi kesadaran tentang cost overrun pada proyek sehingga dapat meminimalisir terjadinya cost overrun.
ANALISIS NILAI WASTE KERAMIK PADA PROYEK X Mathew, Kevin; Waty, Mega
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26610

Abstract

Construction projects often produce values, in the construction field can be interpreted as a loss or a loss of material resources, time, and capital, which is caused by activities that cost money, directly or indirectly, but does not add value to end product for users of construction services. The values produced in the form of materials, quality, time, and costs. In this research, will be examined ceramic, where ceramics often have a significant effect and can influence project costs. Therefore, this research aims to optimize the value of ceramic on project x to optimize costs to reduce its value. The method that will be used in this research is the method of observation, interviews, and analysis of calculations through working drawings, calculations that will be carried out using 2 methods to determine the difference of values so that the value that is expected to be the optimum value for use. This optimization value is very important because the project location is outside Java, and the material supply is on the island of Java so that it can reduce material delivery costs which are quite expensive and can affect the project budget. Keywords: residual value; building project; level of residual value; residual value of ceramics Abstrak Proyek konstruksi serinng kali menghasilkan nilai waste, nilai waste yang di hasilkan dapat berupa waste material,mutu,waktu,hingga biaya. Namun pada penelitian ini nilai waste yang akan di teliti adalah waste keramik dimana keramik seringkali memberikan efek signifikan dan dapat mempengaruhi biaya proyek, oleh karena itu pada penelitian ini bertujuan untuk mengoptimalkan nilai waste keramik pada proyek x agar dapat mengoptimalkan biaya pada proyek hingga berkurang nya nilai waste keramik yang mempunyai dampak negative pada lingkungan sekitar proyek.metode yang akan di gunakan dalam penelitian ini adalah metode pengamatan pada lapangan, wawancara,serta Analisis perhitungan melalui gambar kerja, perhitungan yang akan dilakukan dengan 2 metode yang berbeda untuk mengetahui perbandingan nilai waste sehingga didapatkan nilai yang diharapkan menjadi nilai optimum untuk penggunaan waste. Nilai optimasi ini sangat penting dilakukan dikarankan lokasi proyek yang berada diluar pulau jawa dan supply material berada dipulau jawa sehingga dapat mengurangi biaya pengiriman material yang cukup mahal dan dapat mempengaruhi anggaran proyek