PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN GEDUNG ASRAMA LEMBAGA PENJAMINAN MUTU PENDIDIKAN PROVINSI KALIMANTAN BARAT: PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN GEDUNG ASRAMA LEMBAGA PENJAMINAN MUTU PENDIDIKAN PROVINSI KALIMANTAN BARAT dewi nuryadin, rizka rusmin evita; Agus, watini
RETENSI Vol. 2 No. 1 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v2i1.423

Abstract

Project management is an important factor in the implementation of a project, which will affect the cost, timeand quality. Problems that result in interrelated planning, scheduling, control and are the main requirements forevery project success, in these problems there will be many influencing factors, to achieve maximum results in abuilding construction project, a mechanism is needed that can increase the efficiency and effectiveness ofproject management. of available resources. This can be realized through a management planning system thatmeets the criteria for cost (budget), time (quality), human resources (labor), and a field work safety system. The method used in this management plan is to compare the analysis of the labor unit using the SNI method andthe BOW method, and to obtain a budget plan for both methods. In time management, namely counting thenumber of jobs in each item, making the Critical Path Method (CPM), making bar charts, and making S curves,aspects of human resource management are calculating the number of workers on each work item, Occupationalsafety and health management is knowing the hazards and work control health, knowing personal protectiveequipment and knowing work protective equipment.Based on the SNI method, the Cost Budget Plan (RAB) is Rp. 6,300,380,000.00 and based on the BOW methodof the Budget Plan, the amount of Rp. 9,745,770,000.00, with a Plan time of 120 days or 17 weeks.
the MANAJAMEN KONSTRUKSI PADA GEDUNG HOTEL AL – HAJJ DELAPAN LANTAI DI JALAN LETNAN JENDRAL SUTOYO, KOTA PONTIANAK Farhanika, Annisha Syalwalia; Agus, watini; Fitriani, Nurul
RETENSI Vol. 3 No. 1 (2022): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v3i1.494

Abstract

The author carried out construction management planning on the Eight Story Al - Hajj Hotel Building on Letnan Jendral Sutoyo Street, Pontianak City, which had previously been carried out structural planning and plans by Achmad Idris Setianto and Nurianda Rantau Nika in 2020. Therefore, to realize the construction of the Al - Hajj Hotel Building, proper construction management planning is needed, so that the construction process of this hotel runs smoothly, on time, efficiently and the desired quality can be achieved. Therefore, the author plans a construction management system for the construction of the Al - Hajj Hotel Building which is used as the title of this research. The method used in this construction management discussion is the management system of cost, quality, time, Human Resources (HR) and Occupational Health and Safety (OHS) on structural work which includes foundations, beams, columns and floor plates. Based on the results of the analysis of the method above, the cost of preparatory work and the structure required in the completion of the Al - Hajj Hotel Building construction project is Rp. 43,925,525,000 and can be completed within 30 weeks or 272 calendar days. For quality planning, the results are form of quality control and a list of specification tables. In Human Resources (HR) planning is number of labor needs as a means for good work implementation and in the planning of OHS management planning is form of identification and control of potential OHS hazards to each type of work and the cost for the needs of Personal Protective Equipment (PPE) and Work Protective Equipment (WPE) amounted to Rp. 87,155,000.