Studi Perencanaan Sarana Air Bersih Melalui Sistem Perpipaan di Desa Marmoyo, Kecamatan Kabuh, Kabupaten Jombang Hartadi, Agus; Saves, Faradlillah
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.30874

Abstract

The availability of clean water is mandatory and applies to all places. Marmoyo Village is part of Kabuh District, Jombang Regency which relies on shallow wells to meet its clean water needs. To find out the projected water demands of the population is a population calculation projection. To find out the planning average of clean water demands by pumping tests to find out the maximum discharge of deep wells and the optimum discharge of pumping as well as the planned piping scheme using the Epanet 2.2 program to find out the flow rate, velocity, pressure and headloss. The research results showed that the average discharge requirement in 2044 was 1,163 l/second for a population in 2044 of 1,395 people. Meanwhile, the maximum discharge for deep wells obtained through pumping tests was 1.64 l/second. The piping system uses a double system and a branch system with 2" (50 mm) diameter PVC pipes where the piping system plan will be carried out at RT. 002, RW 007 Marmoyo Village, Kabuh District, Jombang Regency. In the simulation with Epanet 2.2 it is known that the highest velocity are 0.04 m/sec while the highest pressure are 19.86 m.