Olabode, Adewoye S.
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Fuzzy Approach For Determining Statistical Process Control (Spc) Tools Location On Production Floor Ishola, Christie Y.; Olabode, Adewoye S.
Data Science: Journal of Computing and Applied Informatics Vol. 8 No. 1 (2024): Data Science: Journal of Computing and Applied Informatics (JoCAI)
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/jocai.v8.i1-17137

Abstract

Statistical Process Control (SPC) is a technical tool that is used to control and to improve almost any kind of process. However, because of cost consideration, management need to decide which process should apply SPC. In this paper, we propose the use of probability and fuzzy membership function to determine SPC allocation. Conditional probability is used to analyse process failure rate and process repair rate. Then, using Markov Matrix, we calculate the probability of out-of-control process (PO). Nevertheless, in a production line that consists of many parts, the probability value is not adequate to be used as a reference to determine SPC allocation. There are cases for instance, where the value of PO in one part does not mean the same as in other parts since each part may have different sensitivity degree to the final product. For example 0.25 of PO in part 1 may have higher influence to the final product compare to 0.25 of PO in part 2 or part 3. Furthermore, we cannot randomly choose one of those parts to apply SPC or even decide to apply SPC in all parts of the production line. To overcome this problem we propose fuzzy membership function that uses linguistic terms and degree of memberships to analyse PO instead of the probability values. By this mean, the SPC allocation could be determined without ambiguity. For this purpose, the membership function is classified into three categories, namely LOW, MEDIUM and HIGH. Any part with PO fall into the “HIGH” category and high degree of membership is prioritized to apply SPC.