p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Jurnal Sipil Terapan
Yustian Suhandinata
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode from to Chart pada Perusahaan Meubel di CV. Esa Banyuwangi Yustian Suhandinata
Jurnal Sipil Terapan Vol. 1 No. 1 (2023): Mei: Jurnal Sipil Terapan
Publisher : Fakultas Teknik Universitas Cenderawasih

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58169/jusit.v1i1.602

Abstract

Layout is one of the strategic operational decisions that also determines the efficiency of the company's operations in the long term. The right layout shows the characteristics of the adjustment of the layout of the operational facilities with the products or types of services produced and their conversion processes. A good layout will contribute to increasing the company's productivity. CV. ESA is a furniture company that produces multi-products with a make-to-order production system. The layout of the production department at CV. ESA has problems in terms of the distance of moving the cutting results to the installation of the frame which is less efficient. The purpose of the study is to find out and redesign a good production facility layout so that it can minimize the distance and cost of material handling at CV. ESA Banyuwangi. The results of the redesign of the production facility layout concluded that the effective and efficient arrangement of the department layout is in the sequence B C I J K M N O. From the results of data processing, it was obtained about the redesign of the production facility layout in order to obtain a comfortable work area and to minimize the distance of material movement with a total distance of movement per day of 2,516 smaller than the initial layout of 4,916. Calculation of optimum material transfer costs for the initial layout Material transfer costs per month = Rp 23,990 while in the proposed layout Material transfer costs per month = Rp 12,239.
Analisis Biaya dan Waktu Penggunaan Floating Floor sebagai Pengganti Urugan Tanah dengan Metode Value Engineering (VE): Studi kasus Pembangunan Gedung DPRD Kota Mojokerto Yustian Suhandinata
Jurnal Sipil Terapan Vol. 1 No. 2 (2023): November: Jurnal Sipil Terapan
Publisher : Fakultas Teknik Universitas Cenderawasih

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58169/jusit.v1i2.603

Abstract

In the Development of Building Activity Budgeting in the Central Government, the construction world has been marked by the construction of increasingly large and complex buildings and other facilities. This is a business opportunity as well as a challenge for the business community, especially the construction services business. The Mojokerto City Government, in this case the Public Works and Spatial Planning Service of Mojokerto City, can be said to be a construction service business actor because the Public Works and Spatial Planning Service is the owner of a project, one of which is the Mojokerto City DPRD Building Construction Project. Where the project is funded by the APBD for one budget year, namely 2020 for the implementation of the work, with an estimated budget of one year. The location for the construction of the building is former agricultural land and with the results of soil tests through sondir boring, there is soft soil with an average thickness of 1.5 m on the surface of the ground. The use of Floating floors can be used as an alternative in the construction of the lower structure of the Mojokerto City DPRD Building. By using the analysis with the Value Engineering method, the results of the initial design Budget Details obtained a total work price of Rp. 10,043,070,000.00 with 28,984 m3 of gravel fill at a cost of Rp. 6,750,501,695.00, with a time required of 99 days, while the alternative Budget Cost produces a total work price of Rp. 9,389,702,000.00 with the soil fill reduced by the concrete slab as wide as the building so that the gravel fill becomes 22,382 m3 at a cost of Rp. 5,212,802,735.00. Thus there is a cost difference of Rp. 1,537,698,960.00 or 21.8% with an implementation time of 77 calendar days and speeding up the work by 22 calendar days. The use of the Floating Floor Structure can be a substitute for soil fill in the construction of the lower structure of the Mojokerto City DPRD building which is more profitable in terms of both cost and time.