PEMODELAN ESTIMASI BIAYA KONSEPTUAL PROYEK GEDUNG SEKOLAH DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK Oei, Fuk Jin; Kevin Pratama Surya
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 5 No. 2 (2024): Jurnal Rekayasa Teknik Sipil dan Lingkungan, Oktober 2024, ISSN 2722-0230 (Onli
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33541/cen.v5i2.6261

Abstract

According to Central Bureau of Statistics (Badan Pusat Statistik), in 2015 the population of Special Capital Region of Jakarta was 10,177,900 people with the rate of growth 1.02% per annum. Approximately, 14.7% of the population are students. In order to fulfil the demand of good quality education, the X school foundation develops and builds new schools continuously, especially in Jakarta and its suburbs. The planning of school development should be done well. One of the initial steps is to conduct a feasibility study. Conceptual cost estimation is important at this stage. There are some difficulties in estimating the cost at the conceptual stage, such as the lack of preliminary information about the project, lack of project cost data, incomplete data, et cetera. The purpose of this study is to create model using Artificial Neural Network. To determine the input variables, analysis factors were used. After that, the model was created by using Matlab software. This research was conducted by collecting 15 data of school building projects. The result of this study shows the best Artificial Neural Network model is network architecture 7-5-1 with backpropagation algorithm.