PERENCANAAN JARINGAN DISTRIBUSI LISTRIK BAWAH TANAH PADA CLUSTER XYZ Tawakal, Ikbal; Rofii, Ahmad; Kusuma, Ridho Alpha
Jurnal Kajian Teknik Elektro Vol 8, No 2 (2023): JKTE VOL 8 NO 2 (SEPTEMBER 2023)
Publisher : Universitas 17 Agustus 1945 Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52447/jkte.v8i2.6754

Abstract

Perencanaan sistem distribusi energi listrik adalah bagian yang sangat esensial dalam menindak lanjuti pertumbuhan kebutuhan energi listrik yang cukup pesat. Perencanaan sangat diperlukan karena berkaitan dengan tujuan pengembangan, yang harus memenuhi beberapa kriteria dari sisi teknis dan ekonomis baik dalam pelaksanaan maupun dalam perawatan. Perencanaan yang sistemik akan memberikan sejumlah proposal alternatif yang nantinya dapat dikaji akibatnya secara langsung karena akan berdampak pada aspek keandalan dan ekonomis suatu perencaan sehingga dapat ditentukan dengan baik letak dan kapasitas Daya suplai distribusi yang akan melayani areal beban tersebut dengan mempertimbangkan minimisasi susut energi dan investasi konstruksi, tanpa mengurangi kriteria, teknis dan estetika pada kawasan itu sendiri, yang dimana kawan yang sangat mengutaman  estetika biasanya menggunakan jaringan distribusi bawah tanah untuk menghindari bayaknya kabel semrawut terjadi padam listrik akibat kabel putus akibat bayak gangguan dan dimana jenis penghantar menggunakan penghantar jenis Tembaga (CU) NYYGbY 4 x 6 mm² dengan Panjang total 13.655 Meter untuk kabel ke saluran rumah, sedakan untuk kabel dari Panel PHB TR ke PHB Beban menggunakan NYYGbY 4 x 95 mm² dengan Panjang total 5.470 Meter dengan biayah Rp 5,263,175,000. dengan biaya yang cukup tinggi. Sehingga dengan demikian penulis berencana membuat Perencanaan Jaringan Distribusi Bawah Tanah menggunakan penghantar jenis Alumunium (AL) NA2XGbY 4 x 10 mm² untuk kabel ke saluran rumah, sedakan untuk kabel dari Panel PHB TR ke PHB Beban menggunakan NA2XGbY 4 x 185 mm² dengan total biaya penggunaan kabel Alumunium sebesar Rp 1,436,612,500. Sedangkan untuk analisa perhitungan jatuh tegangan (drop Voltage) di dapatkan hasil di bawah 4% sesuai dengan peraturan PUIL dan hasil perhitungan lalu di bandingan dengan menggunakan Sofware Etap 19, Selisih perbandingan masih di bawah 1 % untuk jatuh tegangan.
Analisis Perawatan Berkala Trafo Distribusi 800 kVA pada Rumah Sakit X Kota Tangerang Kusuma, Ridho Alpha; Prayogo, Jimmy Arimas; Mufit, Choirul
Elektrika Vol. 15 No. 1 (2023): April 2023
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v15i1.6478

Abstract

In Indonesia, electricity supply for buildings or buildings with needs above 200kVA requires a distribution transformer owned by the customer, so that electrical energy transactions are carried out on the medium voltage side of 20kV. The distribution transformer in a hospital is a very vital component, especially during the COVID-19 pandemic where transformers are forced to continue operating above nominal levels without any maintenance. Distribution transformer maintenance includes visual inspection, monthly maintenance, maintenance every six months and annual maintenance. Treatments carried out on distribution transformers at X Hospital are DGA (Dissolved Gasses Analysis), transformer insulation testing, TTR (Transformer Turn Ratio) testing, Breakdown Voltage testing, thermovision testing and Winding Resistance testing; In addition, treatment or purification of transformer oil is also carried out based on testing. all dissolved gas and total dissolved gas (TDCG) decreased after the purification process and after purification there is still residual dissolved gas in the transformer. Interpretation of dissolved gas data (DGA) using several methods indicates a "Thermal Fault > 300 Celsius". This is in line with the results of thermovision on the transformer which shows a hot spot at the termination of the HV phase W bushing. Confirmation of this suspect will be checked after repairing the termination.                                                                                                 Keywords: Distribution Transformer, Transformer, Maintenance. ABSTRAKDi Indonesia, suplai kelistrikan untuk bangunan atau gedung dengan kebutuhan diatas 200kVA maka diperlukan trafo distribusi yang dimiliki oleh pelanggan, sehingga transaksi energi listrik dilakukan di sisi tegangan menengah 20kV. Trafo distribusi di sebuah rumah sakit merupakan suatu komponen yang sangat vital, terutama selama masa pandemic COVID-19 dimana trafo dipaksa untuk tetap beroperasi diatas narus nominal tanpa adanya perawatan. Perawatan trafo distribusi meliputi inspeksi visual, perawatan bulanan, perawatan tiap enam bulan dan perawatan tahunan.  Perawatan yang dilakukan di trafo distribusi di Rumah Sakit X ini adalah DGA (Dissolved Gasses Analysis), pengujian insulasi trafo, pengujian TTR (Transformer Turn Ratio), pengujian Breakdown Voltage, pengujian thermovision dan pengujian Winding Resistance, selain itu juga dilakukan treatment atau purifikasi oli trafo Berdasarkan pengujian. semua gas terlarut dan total gas terlarut (TDCG) menurun setelah proses pemurnian dan setelah pemurnian masih ada sisa gas terlarut di trafo. Interpretasi data gas terlarut (DGA) dengan beberapa metode menunjukkan adanya “Termal Fault > 300 Celcius”. Hal ini sejalan dengan hasil thermovision pada trafo yang menunjukkan adanya hot spot pada bagian terminasi busing W fasa HV. Konfirmasi tersangka ini akan dilakukan pengecekan setelah dilakukan perbaikan terminasi.